My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-24_REVISION - M1993041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1993041
>
2009-06-24_REVISION - M1993041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:03:01 PM
Creation date
6/26/2009 12:04:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993041
IBM Index Class Name
REVISION
Doc Date
6/24/2009
Doc Name
Inclusions
From
Banks and Gesso, LLC
To
DRMS
Type & Sequence
TR2
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PETROS & WHITELLC <br />ATTORNEYS AT LAW <br />1999 BROADWAY, SUITE 3200 <br />DENVER, COLORADO 80202 <br />TELEPHONE (303) 825-1980 <br />1983 <br />FACSIMILE (303) 825- <br />Via e-mail and U.S. Mail <br />Mr. Dave Nettles <br />Assistant Division Engineer, Division 1 <br />Ms. Shera Somerford <br />Water Commissioner, District 5 <br />810 9th Street <br />Greeley CO, 80631 <br />June 10, 2009 <br />Re: Dowe Flats Surface Water Substitution or Exchange <br />Dear Mr. Nettles and Ms. Somerford: <br />Thank you for your prompt response, by letter dated May 28, 2009, to the proposal made <br />on behalf of our client, Cemex, Inc., to operate a surface water substitution or exchange at the <br />Dowe Flats quarry site. We understand and accept your suggested modification and propose the <br />following to allow for real-time substitution of C-BT water for surface water captured and stored <br />in the Dowe Flats quarry pits when Cemex's Dowe Flats Storage Right is not in priority between <br />April 1 and October 31 of each year. <br />As you suggested, Cemex will place C-BT units corresponding to 13 acre-feet of water at <br />the Water Commissioner's disposal on or before April 30 of each year rather than June 15 as <br />suggested in our initial proposal. The Water Commissioner may release this water, as necessary, <br />in substitution of water captured in the Dowe Flats quarry pits when the Dowe Flats Storage <br />Right is not in priority during the summer months (April 1 to October 31). When and if, at any <br />time, additional substitute water is necessary as demonstrated by the monthly accounting reports, <br />Cemex shall at the Water Commissioner's request, direct the Northern Colorado Water <br />Conservancy District ("Northern") to deliver the requisite units of C-BT water to the St. Vrain. <br />As described in our initial proposal, Cemex shall provide replacement C-BT water for <br />surface water stored out of priority from October 31 to April 1, should the Dowe Flats Storage <br />Right not come into priority during the spring runoff. Such releases shall be made by the Water <br />Commissioner from C-BT units turned over to the Water Commissioner for this purpose by <br />Cemex on or before June 15 of each year. <br />The remainder of our proposal remains unmodified, including Cemex's intent to provide, <br />on or before June 15, 2009, any of the 25 acre-feet of replacement water necessary for <br />substitution of water already stored in the Dowe Flats quarry pits which has not been supplied by <br />the exercise of Cemex's Dowe Flats Storage Right as of that date. It is our understanding,
The URL can be used to link to this page
Your browser does not support the video tag.