2009-06-24_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-06-24_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
6/26/2009 12:03:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/24/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- 6/7/09.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />amen <br />Earth & Environmentai <br />LOB EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 Project No.: 84201125EO <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Contractor: Ames Construction Co. Inc. <br />Shift: Day/Night <br />Work Element: Phase 5 CQA/ LOB <br />Date: June 13, 2009 <br />Reporting Period: 06/07/09 through 06/13/09 <br />Days S M T W T F S <br />Work Shifts D D D D D D <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range: Lows: 37°F to 42°F (+/-) Highs 53°F to 68°F (+/-) <br />AMEC: CQA Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No work delays due to weather. <br />All work for the LOB Project is complete. This will be the last weekly report submitted for the LOB <br />Project. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />I) Earthworks <br />A) Overburden to Stockpile <br />1) LOB Conveyor Corridors <br />Excavation at Conveyor Corridor #3 was completed using a CAT 375 excavator. The <br />excavated material was cast just to the west of the excavation or hauled to the Joe Dandy Main <br />Cresson Backfill using 40-ton articulating haul trucks. <br />Excavation of Conveyor Corridor #4 was completed using a CAT 375 excavator, allowing for <br />culvert installation. The excavated material was loaded into 40-ton articulating haul trucks and <br />hauled to the Joe Dandy Main Cresson Backfill. <br />B) Cut to Fill <br />1) LOB Delivery Road <br />Finish grading of the entire LOB Delivery Road length and width was performed using two <br />CAT 966 front-end loaders, a CAT D-8 dozer, a CAT D-6 dozer, and a CAT 14-G motor- <br />grader. Fine grained material from the Phase 5 VLF excavation and -2" material from the <br />Arequa processing area were hauled using 40-ton articulating haul trucks. Moisture <br />conditioning of the fill material was performed using a CAT 773 water truck and compacted <br />using a CAT 563 vibratory smooth drum compactor. <br />Sheet 1 of 8 <br />LOB Weekly Report WE 06.13.09.D.doc