My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-04_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2009-05-04_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:10 PM
Creation date
6/24/2009 11:22:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
5/4/2009
Doc Name
Cost Estimate
Type & Sequence
TR116
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task #: 16e State : Colorado <br />Date : 0510412009 County : Gunnison <br />User : TAK Site : West Elk Mine <br />Permit/job# : C-80-007 <br />Abbreviation :none <br />Filename :0007-16e <br />Agency or organization name : CDRMS <br />Permit or other job action : TR-116, New pond at Sylvester Gulch mine water pumping site <br />Task description : Grade topsoil on lower mine water pumping pond in Syl. G. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.13 NA <br />Operating cost/hour : $77.13 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $167.03 Total fleet cost/hour : $668.13 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,613 LCY factor : NA volume : 1,613 LCY <br />Source of estimated volume: 1. 2 million gallon pond capacity, Exhibit 69 <br />Source of estimated swell factor : CAT Handbook <br />. <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Top Soil <br />4.00 % (pos) <br />6.800 feet <br />1,600 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Unit cost : $0.200 /LCY <br /> Operator skill : 0.75 (avg.) <br /> Material consistency : 0.90 (Cat HB) <br /> Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br /> Job efficiency : 0.83 (1shift1day) <br /> Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.93 (Cat HB) <br /> Altitude : 1.00 (Cat HB) <br /> Material weight : <br />Blade type : <br />Net correction : <br />Adjusted unit production : 1.44 <br />1.00 <br />0.60 <br />835.06 (Cat HB) <br />(S/SU/U) <br /> <br />LCY/hr <br /> Adjusted fleet production : <br />Total job time : 3,340.24 <br />0.48 LCY/hr <br />Hours <br />Total job cost : $323