My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-04_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2009-05-04_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:10 PM
Creation date
6/24/2009 11:22:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
5/4/2009
Doc Name
Cost Estimate
Type & Sequence
TR116
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Team Work cont'd Task #: 161 sheet 2 of 2 <br />Loading Tool Cycle Time : Number of loading tool passes required to fill truck : 2 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />- selected value within basic rating : NA <br />Track loaders - material descr.: NA <br />- cycle time elements (min.) : Load : NA Maneuver : NA Dump : NA <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and duml 0.575 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Material 314" to 6" diameter 0.000 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high and up 0.000 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment : -0.080 <br /> Adjusted loader cycle time (total time per loader pass) : 0.495 <br /> Net load time per truck * : 0.595 <br />Truck Cycle Time : *bulk of fat loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />Truck exchange time **: 0.50 minutes........ Adjusted for site altitude : 0.500 <br />Truck load time: 0.595 minutes........ Adjusted for site altitude : 0.647 <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 0.900 <br />** set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />Truck travel (haul & return) time: Road condition : Rutted dirt little maintenance, no water, 2" tire p, <br />Haul route : <br />minutes <br />minutes <br />minutes <br />minutes <br />minutes <br />minutes <br />Road <br />segment # Haul distance <br />(feet) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />(feet/minute) Travel time <br />(minutes) <br />1 700 0.00 5.00 5.00 2218 0.383 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul time ** : 0.383 <br />minutes <br />minutes <br />minutes <br />Loading tool unit production : 447.36 LCY/hour...... Adjusted for job efficiency : 371.31 LCY/hour <br />Truck unit production : 189.69 LCY/hour...... Adjusted for job efficiency : 157.45 LCY/hour <br />Optimal no. trucks/loading tool : 2 trucks........... Selected no. trucks/loader : 2 trucks <br /> Adjusted hourly truck team production : 314.89 LCY/hr <br /> Adjusted hourly single truck/loader team production : 314.89 LCY/hr <br /> Adjusted hourly multiple truck/loader team production : 314.89 LCY/hr <br />i <br />JOB TIME AND COST <br />Fleet size Team(s) Total job time : 5.12 Hours <br />Unit cost : $2.062 /LCY Total job cost : $3,326 <br />' travel time shown for each segment includes acceleration/deceleration adjustment Return time**: 0.274 <br />" total haul and return time shown includes altitude adjustment Total truck cycle time : 2.704
The URL can be used to link to this page
Your browser does not support the video tag.