My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-22_REVISION - C1980007 (2)
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2009-06-22_REVISION - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:48:04 PM
Creation date
6/23/2009 2:49:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
6/22/2009
Doc Name
Letter & Application (Email)
From
Mountain Coal Company
To
DRMS
Type & Sequence
MR356
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?p'CO<o <br />moo: $ <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />". 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />JUN 2 2 2009 <br />APPLICATION FORM FOR A REVISION uiwsioii u. 7.?ciamation, <br />TO A COAL MINING AND RECLAMATION PERMIT Mining and Safety <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule <br />1.04(73), technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule <br />1.04(90). All revisions are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, <br />including maps, must be submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, <br />maps, tables and/or figures, with a revised table of contents, if necessary. The revision submittal date <br />should be printed in the lower right corner of each revision page. A cover letter to the revision should <br />explain the nature of the revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal <br />mailing list (except OSM) at the same time the application is submitted to the Division, and proof of <br />distribution must be submitted to the Division along with the application. Copies of revision pages modified <br />during the review process must be distributed in the same manner, along with proof of distribution. Proof <br />of distribution must be submitted prior to implementation of the revision. <br />Permit No.: C - 1980 - 007 Date: 06 / 22 / 09 <br />Permittee: Mountain Coal Company, LLC <br />West Elk Mine <br />Street: P.O. Box 591 <br />City: Somerset <br />State: CO Zip Code: 81434 - <br />Brief Description of Revision: Minor Revision No. MR-356, RPE bulldozer trail and interim <br />topsoil stockpile <br />Public Notice Attached: Yes <br />No X (Required for PRs and TRs) <br />Bond Increase: Yes No X <br />Proposed Change in: <br />Permit Area - <br />Disturbed (+ /-) 0 . 05 Acres <br />Permit (+ /-) 0 0 Acres <br />Affected (+ /-) 0 0 Acres <br />Mineral Ownership - <br />Mineral Private (+/-) <br />Mineral Federal (+/-) <br />0 0 Acres <br />0 0 Acres <br />Federal X Non-Federal Mine <br />Surface Ownership - <br />Private Land (+ /-) 0 . 0 Acres <br />Federal Land (+ /-1 0 0 Acres <br />State Land (+ /-) 0 0 Acres <br />Mineral State (+ /-) _ 0 . 0 Acres
The URL can be used to link to this page
Your browser does not support the video tag.