Laserfiche WebLink
Stipulation No. 9: THE APPLICANT MUST ALSO SUBMIT, AS PART OF THE PERMIT <br />APPLICATION, WRITTEN DOCUMENTATION AS TO THE NATURE OF THE <br />REGIONAL IRRIGATION INVENTORY PERFORMED. THIS DOCUMENTATION MUST <br />ADDRESS THE DEFICIENCIES OUTLINED IN SECTION C OF THIS TEA, SO THAT THE <br />AVF DETERMINATION FOR SCULLION GULCH CAN BE ADEQUATELY <br />SUBSTANTIATED. THE INFORMATION SHOULD BE SUBMITTED WITHIN 30 DAYS <br />OF THE GRANTING OF THE PERMIT. <br />Status: This stipulation was satisfied and terminated on 10 August 1981. <br />Stipulation No. 10: THE APPLICANT SHALL PROVIDE THE REGULATORY AUTHORITY <br />WITH A CORRECTED VERSION OF MAP 77, REFUSE DISPOSAL AREA SITE <br />PREPARATION, WHICH SHOWS THE LOCATION OF THE CULVERT THAT CARRIES <br />FLOW FROM THE NON-TOXIC FILL STOCKPILE DITCH ACROSS THE HAUL ROAD <br />INTO THE SUBAREA R2-3 SEDIMENT POND. THIS INFORMATION SHOULD BE <br />SUBMITTED WITHIN 90 DAYS OF APPROVAL OF THE MINE PLAN PERMIT. <br />Status: This stipulation was satisfied and terminated on 27 October 1981. <br />Stipulation No. 11: WITHIN 60 DAYS OF APPROVAL OF THE MINING PERMIT, THE <br />APPLICANT SHALL PROVIDE DITCH DIMENSIONS FOR THE ENTIRE "NORTH <br />TOPSOIL DITCH" IN THE D-PORTAL AREA. THESE PLANS MUST BE SUBMITTED <br />AND APPROVED PRIOR TO THE ONSET OF CONSTRUCTION AT THE D-PORTAL <br />AREA. <br />Status: This stipulation was satisfied and terminated on 27 September 1981. <br />Stipulation No. 12: WITHIN 60 DAYS OF APPROVAL OF THE MINING PERMIT, THE <br />APPLICANT MUST SUBMIT THE CALCULATIONS AND ASSUMPTIONS USED TO <br />SIZE THE RAILROAD LOOP SEDIMENTATION PONDS, AND MUST RESIZE THE <br />OUTLET CULVERT IN SEDIMENTATION POND NO.4 IN THE RAILROAD LOOP TO <br />PREVENT EXCESSIVE PONDING AT THE ENTRANCE OR JUSTIFY THE PRESENT <br />SIZING WITH APPROPRIATE CALCULATIONS. THE LOWER SEGMENT OF THE <br />SUBAREA R4 REFUSE DITCH MUST ALSO BE RESIZED TO ACCOMMODATE THE 10 <br />YEAR-24 HOUR FLOW. <br />Status: This stipulation was satisfied and terminated on 27 September 1981. <br />Stipulation No. 13: THE APPLICANT SHALL SUBMIT TO THE REGULATORY <br />AUTHORITY WITHIN 90 DAYS A MODIFIED RESTORATION PLAN FOR SCULLION <br />GULCH TO OMIT THE 13 PROPOSED IN-CHANNEL ROCK CHECK DAMS. IN LIEU OF <br />THESE, THE APPLICANT SHALL INSTALL 3 DAMS OF SEDIMENT TRAPS, BUILT TO <br />SCS OR US FOREST SERVICE SPECIFICATIONS, AT THE DOWNSTREAM <br />CONSTRUCTION LIMITS IN SCULLION GULCH. THESE TRAPS SHOULD PROVIDE <br />SUFFICIENT STORAGE TO STORE ONE YEAR OF SEDIMENT ACCUMULATION <br />FROM D-PORTAL AREA. <br />Deserado Mine 7 June 18, 2009