Laserfiche WebLink
CONTAIN TOXIC MATERIALS. <br />Status: This stipulation was satisfied and terminated on 27 August 1981. <br />Stipulation No. 29: A STATE AIR QUALITY PERMIT IS REQUIRED BEFORE <br />CONSTRUCTION AND OPERATION CAN BEGIN. <br />Status: This stipulation was satisfied and terminated on 27 August 1981. <br />Stipulation No. 30: WITHIN 30 DAYS OF ACCEPTANCE OF APPROVAL OF THE MINE <br />PLAN, THE APPLICANT SHALL ENSURE THAT THEIR CULTURAL RESOURCE <br />CONTRACTOR HAS SUFFICIENTLY DOCUMENTED THE 17 "POTENTIALLY" <br />ELIGIBLE SITES SO THAT OSM MAY SUBMIT A REQUEST FOR ELIGIBILITY OR <br />NON-ELIGIBILITY CONCURRENCE FOR THESE SITES TO THE COLORADO SHPO. <br />THE INITIAL DOCUMENTATION ON THE ELIGIBILITY TEST PROGRAM MAY BE IN <br />DRAFT FORM AND CONCERN ITSELF ONLY WITH THE QUESTION OF ELIGIBILITY. <br />A BRIEF FINAL REPORT ON THE TESTING PROGRAM SHOULD BE SUBMITTED <br />WITHIN 90 DAYS. <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 31: FOLLOWING SHPO REVIEW AND CONCURRENCE WITH THE <br />ELIGIBILITY ASSESSMENTS, OSM WILL PROVIDE WESTERN FUELS WITH A LIST <br />OF SITES THAT HAVE BEEN DETERMINED ELIGIBLE. WITHIN 60 DAYS OF RECEIPT <br />OF THIS ELIGIBILITY LIST, WESTERN FUELS WILL SUBMIT A SITE-SPECIFIC <br />MITIGATION PLAN FOR THOSE ELIGIBLE SITES FOR REGULATORY APPROVAL. <br />Status: This stipulation was satisfied and terminated on 25 September 1981. <br />Stipulation No. 32: THE OPERATOR SHALL IMPLEMENT THE MITIGATION <br />PROCEDURES SPECIFIC IN STIPULATION NO. 2 IN STRICT ADHERENCE WITH THE <br />OBJECTIVES, METHODS, AND TECHNIQUES SPECIFIED IN THE MITIGATION <br />PROPOSAL APPROVED BY THE REGULATORY AUTHORITY AND THE COLORADO <br />SHPO. THE PLAN SHALL BE IMPLEMENTED IN ACCORDANCE WITH PART II OF <br />THE ADVISORY COUNCIL'S "GUIDELINES" AND ANY DEVIATIONS FROM THE <br />APPROVED PROPOSAL MUST FIRST BE SUBMITTED TO THE REGULATORY <br />AUTHORITY FOR APPROVAL. <br />Status: This stipulation was satisfied and terminated on 9 May 1986. <br />Stipulation No. 33: UNTIL FINAL ELIGIBILITY CONCURRENCE AND A <br />DETERMINATION OF "NO EFFECT" OR "NO ADVERSE EFFECT" IS OBTAINED FROM <br />THE COLORADO SHPO, NO WORK WILL BE PERMITTED IN AREAS WHICH MIGHT <br />ENDANGER THE INTEGRITY OF THE FOLLOWING SITES: 5RB854, 855, 856, 860, 906, <br />907, 921, 1008, 1029, 1047, 1051, 1148, 1160, 1170, 1171, 1175, 1176, 232, 491, 858, 859, 903, <br />922, AND 1059. ONCE CONCURRENCE IS ACHIEVED, OSM WILL NOTIFY WESTERN <br />FUELS AS TO THOSE AREAS THAT STILL REQUIRE PROTECTION UNTIL <br />Deserado Mine 11 June 18, 2009