Laserfiche WebLink
LEASES. <br />Status: This stipulation was satisfied and terminated on 27 August 1981. <br />Stipulation No. 24: COMPANY HAS NOT SUBMITTED ADEQUATE INFORMATION ON <br />MULE DEER AND ANTELOPE MIGRATION PROBLEMS THROUGH THE AREA OF <br />DISTURBANCE. IN ORDER TO DEVELOP PROPER MITIGATION PLANS FOR THE <br />PROTECTION OF THE INTEGRITY OF MIGRATION ROUTES BRIEFLY IDENTIFIED IN <br />BLM'S FINAL EIS ON THE MOON LAKE PROJECT, THE FOLLOWING STIPULATION <br />HAS BEEN DEVELOPED: THE APPLICANT MU15T SUBMIT TO THE REGULATORY <br />AUTHORITY THE COMPLETE STUDY RESULTS FOR MULE DEER AND ANTELOPE <br />MIGRATION CONSIDERATIONS WITHIN 30 DAYS OF APPROVAL. <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 25: DUE TO POOR WEATHER CONDITIONS, THE APPLICANT'S <br />SURVEY FOR SAGE GROUSE LEK ACTIVITIES WERE UNSUCCESSFUL. A SURVEY <br />IS BEING CONDUCTED IN SPRING OF 1981 TO DETERMINE IF ANY LEKS DO OCCUR <br />IN THE AREA TO BE DISTURBED. THEREFORE, BEFORE ANY EVALUATION CAN <br />BE INITIATED, THAT SURVEY MUST BE SUBMITTED. WITHIN 30 DAYS OF THE <br />MINE PLAN APPROVAL, THE APPLICANT SHALL SUBMIT TO THE REGULATORY <br />AUTHORITY THE RESULTS OF THE LEK SURVEY AND WHAT MITIGATION <br />PROCEDURES WILL BE USED TO MINIMIZE IMPACTS TO SAGE GROUSE AND <br />THEIR HABITATS. <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 26: ADEQUATE PROTECTION FOR ACTIVE GOLDEN EAGLE NESTS <br />ADJACENT TO THE MINING SITE MUST BE PROVIDED. THEREFORE, THE <br />FOLLOWING DESCRIBED LANDS ARE CLASSIFIED AS UNSUITABLE FOR SURFACE <br />DISTURBANCE AND OCCUPANCY. PERIODIC ACTIVITY DURING THE NON- <br />NESTING SEASON (JUNE 1 - FEBRUARY 28) WITHIN THE BUFFER ZONE CAN BE <br />APPROVED ON A CASE BY CASE BASIS: FEDERAL LEASE D-047201, T2N, R10W, <br />6TH PM, SEC. 3, S 1/2 SE1/4, SEC. 10, NE 1/4 NE 1/4; FEDERAL LEASE C-02373, T2N, <br />R10W, 6TH PM SEC. 3, E 1/2 SE/4 SW 1/4. <br />Status: This stipulation was satisfied and terminated on 27 August 1981. <br />Stipulation No. 27: UPON APPROVAL OF DEPARTMENTAL ACTION, THE OPERATOR <br />WILL SUBMIT WITHIN 30 DAYS PLANS FOR CONSTRUCTION OF POWERLINES <br />USING APPROVED GUIDELINES FOR RAPTOR PROTECTION. <br />Status: This stipulation was satisfied and terminated on 23 September 1981. <br />Stipulation No. 28: UPON APPROVAL OF DEPARTMENTAL ACTION, THE OPERATOR <br />WILL COMMIT WITHIN 30 DAYS TO NOT USING PERSISTENT PESTICIDES UNLESS <br />APPROVED BY THE REGULATORY AUTHORhEY AND TO FENCE ANY PONDS THAT <br />Deserado Mine 10 June 18, 2009