Laserfiche WebLink
Colowyo C-1981-019 <br /> 27 May 2009 <br /> Pg 6/7 <br /> Backfilling and Grading (cont.): - The area in the East Pit that was repaired last fall (as <br /> a result of the large rainfall in August 2008) appear to remain stable. The two large <br /> gullies that were filled in appear to remain stable and do not show any signs of <br /> reforming. The contour ditches that were put in place are helping to slow and direct <br /> the water that is flowing over the area from the recent heavy rainfall. There does not <br /> appear to be any additional rilling of the reclaimed slopes from the recent rain. <br /> There is also some water in the sump that is in this area. The Prospect Ditch was dry <br /> and appeared to be stable and functioning as designed. The Division would like to <br /> remind Colowyo that the area that was regraded just above Prospect Pond at the <br /> tie-in to the native area will need to have the topsoil replaced and will need to be <br /> reseeded this fall. <br /> Topsoil: - The topsoil pile north of the final East Pit that was seeded last fall has good <br /> vegetative growth on it this spring. The pile appears to be stable and no erosional <br /> problems were noted. <br /> - The topsoil just below the Section 28 Pond is well vegetated and appears to be <br /> stable. No erosional problems were noted on the pile. <br /> General Mine Plan Compliance: - The 101 dragline is on the East Pit highwall where it <br /> was performing reclamation. <br /> - The 102 dragline was out of sequence and performing regrading operations in the <br /> north west corner of the West Pit. <br /> - The 103 dragline was removing overburden for the mid-pit area of the E-Seam in the <br /> West Pit. <br /> - The 114 shovel was not operating on 27 May 2009 but it was operating in a lower <br /> drainage area of Taylor Draw in the South Taylor Pit on 28 May 2009. <br /> - The 115 excavator was idle at the time of the inspection. <br /> - There was a dozer cleaning coal in the South Taylor Pit box-cut area. <br /> - The mining at the Colowyo Mine appears to be progressing as discussed and <br /> approved in the PAP. <br /> Air Resource Protection: - The haul roads in the East Pit, West Pit and South Taylor Pit <br /> were all dry at the time of the inspection. There was some dust coming from the <br /> roads but the operator was running a water truck. <br /> Excess Spoil: - The current active dump area for the South Taylor Pit is the C-C' <br /> underdrain area of the East Taylor fill. The overburden is coming from the overburden <br /> in the Taylor Draw area of the box-cut. The fill has advanced to almost the crusher <br /> bench (which will be relocated). Most of the liffs have reached their maximum <br /> height and the remaining lift is approximately 50-feet below its maximum height. The <br /> fill appeared to be stable at the time of the inspection. It was not known which <br /> section of the East Taylor Fill would be used next, after this area is completed to the <br /> extent possible. <br />