My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-15_REVISION - C1981019 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-06-15_REVISION - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:46 PM
Creation date
6/16/2009 11:02:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
6/15/2009
Doc Name
Preliminary Adequacy Review
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR76
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Miscellaneous <br />10. The third paragraph of Page 4.03-1 has been modified to incorporate South <br />Taylor Haul Road information. However, the remainder of the page <br />continues to refer to "both" Haul Roads (presumably A and B). Please modify <br />the remainder of Page 4.03-1 to ensure clarity and consistency with the fact <br />that there will now be three permitted haul roads. <br />Response: Colowyo has added clarifying text to Page 4.03-1 identifying the fact that <br />there will now be three permitted haul roads on the mine site. Colowyo has included <br />two copies of this text for the Division's ease of incorporation into the permit. <br />11. The last sentence of the third paragraph on Page 4.03-1 refers to Permit <br />Volume Fourteen, but the "Change Sheet" which accompanied the <br />application indicates that it is pages in Volume 12 that have been modified. <br />The text portion of the South Taylor expansion is contained in permit Volume <br />12. Please correct this discrepancy. <br />Response: Colowyo has changed this discrepancy to refer readers to the correct <br />Volume 12 instead of Volume 14. <br />12. The fourth paragraph on page 4.03-1 states that the "haul roads" have been <br />paved with asphalt... According to the Construction Notes on Map 25C, the <br />South Taylor Haul Road will be surfaced with rock or crushed gravel. Please <br />revise the text on page 4.03-1 to clarify the type of surfacing for each of the <br />three haul roads. <br />Response: Colowyo has revised the text on Volume 1, Page 4.03-1 to clarify the type <br />of surfacing for each of the three permitted haul roads on the mine site. <br />13. Although unrelated to the South Taylor Haul Road designs per se, on the <br />third line of the forth paragraph on page 4.03-1 there is an extraneous period <br />(".") between the phrase "locate in" and the word "the". Please remove this <br />period. <br />Response: Colowyo has removed this extraneous period (".) from the paragraph on <br />page 4.03-1. <br />This completes Colowyo's first round of responses to the Division's preliminary <br />adequacy review for TR-76. Two copies of maps associated with this TR will be <br />mailed separately by P.E. Tom Peterson to the Division. Please incorporate these <br />into the permit. All copies of text are included with this response as well as an index <br />sheet to aide incorporation of the material into the permit. Should you have any <br />questions relating to this response, please feel free to contact me at (970) 824- <br />1578.
The URL can be used to link to this page
Your browser does not support the video tag.