My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-15_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2009-06-15_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:46 PM
Creation date
6/16/2009 10:57:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
6/15/2009
Doc Name
Reclamation Cost Estimate
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
TR63
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 215 State :Colorado Permit/job# :C-1981-022 <br />Date : 0611512009 County :Delta Abbreviation :none <br />User : JRS Site :Elk Creek Mine Filename : C022-215 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Technical Revision 63 <br />Task description :Replace Topsoil from Stockpile to Light-Use Roads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,900 BCY factor : 1.250 volume : 8,625 LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Fa( <br />Operator skill <br />Average push distance : 50 feet Material consistency <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Dry packed <br />5.00 % (I <br />8,000 feet <br />2,550 Ibs/LCY <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST e <br />Fleet size : 1 Dozer(s) Total job time : <br />Unit cost : $0.255 /LCY Total job cost : <br />ors <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.90 <br />0.95 <br />0.90 <br />1.00 <br />0.39 <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/day) <br />(fnd-rt) <br />(Cat HB) <br />(Cat HB) <br />813.43 LCY/hr <br />813.43 LCY/hr <br />10.60 Hours <br />$2,201
The URL can be used to link to this page
Your browser does not support the video tag.