My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-15_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2009-06-15_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:46 PM
Creation date
6/16/2009 10:57:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
6/15/2009
Doc Name
Reclamation Cost Estimate
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
TR63
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: 214 <br />Date : 0611512009 <br />User: JRS <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Technical Revision 63 <br />Task description :Replace Topsoil from Stockpile to 17 Drill Pads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 13.700 BCY factor : 1.250 volume : 17.125 LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 % (I <br />Average site altitude : 8,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv hacked <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />VisibilityJob efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type <br />Net correction <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.433 /LCY <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County:Delta <br />Site :Elk Creek Mine <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />Permit/job# : C-1981-022 <br />Abbreviation :none <br />Filename :C022-214 <br />Source <br />0.75 (avg.) <br />1.00 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1 shift/day) <br />0.80 (fnd-rf) <br />0.90 (Cat HB) <br />0.95 (Cat HB) <br />0.90 (Cat HB) <br />1.00 (S/SU/U) <br />0.39 <br />479.16 LCY/hr <br />479.16 LCY/hr <br />35.74 Hours <br />$7,417
The URL can be used to link to this page
Your browser does not support the video tag.