Laserfiche WebLink
} <br />- ~ t <br />AN ICIP TED ECLAMATION FOR 2}009-2010 <br />_ I ~ I ~ <br />Des lacement of overburde - <br />pi nand topsoil is planned to continue m the <br />11/,at~rfal-Resource Area;-producing-overburden piles and topsoil piles <br />I_ ~ i i i i i <br />a~s---den#i~fie~-inn---the- ~approwed- - ,mining- plan. ~ Additionally, the <br />r-eclama#io~n-of--mined--slopes-~ is ;expected #o progress from west to <br />east as the__n~or_th__mininglface i,s extract <br />i ~ ~ i . I ~ i ed and from south to north as <br />the east mining.face is extracted., As finished slopes are completed, <br />it is anticipated some of the; stockpiled topsoil will be utilized to <br />- ---r---~--t t- t ~ f <br />reshape the. excavated .face to a 4 (H):1(V) slope. Seeding will then <br />take~place;~in~ the fall, to .enhance success of germination. Required <br />ongoing inspection and maintenance of the implemented Best <br />- - Managements Pr,'actices, in accordance to the SWMP, will also occur <br />-rni 20101 A{copy of the City's Stormwater Discharge Permit is attached <br />-fir referen,ce.~ <br />j-` <br />DATES FOR BEGINNING AND CEASING OPERATIONS <br />i <br />Extraction operations will continue sporadically throughout 2009- <br />- 2010. Ceasing of operations is not anticipated in the immediate <br />future. Extraction of material from the Material Resource Area will be <br />on an as-needed basis. <br /> <br />