Laserfiche WebLink
<br />RECLAMATION ACCOMPLISHED TO DATE <br />This pit was permitted in 2007; the reclamation accomplished in the <br />past two years is mainly related to excavation of material similar to pit <br />run in addition to stockpiling of topsoil. Excavation has closely <br />followed the predicted mining locations depicted in last year's annual <br />report. Construction of diversion ditches, sedimentation pond and silt <br />fencing, as shown on Exhibit 1, occurred in 2007 and are currently <br />functioning as designed. The City has an approved Stormwater <br />Discharge Permit and is maintaining the Best Management Practices <br />associated with this permit. <br />ANTICIPATED NEW DISTURBANCES FOR 2009-2010 <br />The extraction of materials from the Material Resource Area is <br />expected to continue eastward on the north mining face and <br />northward on the east mining face. The estimated mining face <br />displacement is anticipated approximately 5 to 10' and is more clearly <br />depicted in Exhibit 1. <br />Fig. 6 -- Looking East from entry at south extraction face. <br />