Laserfiche WebLink
BOREHOLE SEALING WORK <br />Task e: 54b <br />mi..: West Elk Mine <br />Permit no.: C-80-007 <br />Permitting action: MR-354 <br />Date: 5/14/09 <br />Prepared by: TAK <br />Cwt of bulk cement Water <br /> <br />(assuming 94 Ibs of <br />Total rig Rig w/ crew 2,500 gal <br />truck wl Octoplug Cut surface Total cost <br />Hole Hole Cement cost <br />Total cement per 1.18 d of Cement <br />Rig setup time Rig time to time hourly rate Total rig water truck <br />driver cost (Circes, casing 8 before bond <br />Total rig time (setup <br />Hole diam. volume per cwt <br />depth (ft) hole, that is 100 Ibs total cost <br />per hole (hr) fill hole (setup + (Circes, Reed cost w/driver <br />(rig FlII $19.57 mark % Liab. release or <br />fill), reduced for liab. % <br />(in) (cf) (CIRCES) <br />of cement fills 1.25 <br />fill) drill, 9.0") hourly rate <br />time x per in. (Circes, Increment <br /> <br />cf) (Circes) <br />truck rate) diam.) $10.9011f) obligation <br />Geotechnical Holes, approved in MR-354 <br />B-1 8 45 16 12.6 $8.78 $110 0.50 0.50 1.00 $193.22 $193 $60 $30 $157 $23 100% $513 1.00 <br />B-2 8 45 16 12.6 $8.78 $110 0.50 0.50 1.00 $193.22 $193 $60 $30 $157 $23 100% $513 1.00 <br />B-3 8 45 16 12.6 $8.78 $110 0.50 0.50 1.00 $193.22 $193 $60 $30 $157 $23 100% $513 1.00 <br />B-4 8 45 16 12.6 $8.78 $110 0.50 0.50 1.00 $193.22 $193 $60 $30 $157 $23 100% $513 1.00 <br />B-5 8 45 16 12.6 $8.78 $110 0.50 0.50 1.00 $193.22 $193 $60 $30 $157 $23 100% $513 1.00 <br />B-6 8 45 16 12.6 $8.78 $110 0.50 0.50 1.00 $193.22 $193 $60 $30 $157 $23 100% $513 1.00 <br />B-7 8 45 16 12.6 $8.78 $110 0.5 0.50 1.00 $193.22 $193 $60 $30 $157 $23 100% $513 1.00 <br />B-8 8 45 16 12.6 $8.78 $110 0.5 0.50 1.00 $193.22 $193 $60 $30 $157 $23 100% $513 1.00 <br />B-9 8 30 10 8.4 $8.78 $74 0.5 0.50 1.00 $193.22 $193 $60 $30 $157 $23 100% $476 1.00 <br />B-10 8 30 10 8.4 $8.78 $74 0.5 0.50 1.00 $193.22 $193 $60 $30 $157 $23 100% $476 1.00 <br />Subtotal - this page <br />Grand Total $5,056 10.00 rig hours <br />/ 2 rigs <br />5.00 project ours