Laserfiche WebLink
RECLAMATION <br />MINING <br />SAf ETY <br />Permit No. C-80-007 <br />Mine name: West Elk <br />TASK LIST (DIRECT COSTS) <br />New Task no. Task description <br />54b Seal boreholes <br />54r Rip road and drill sites <br />54d Regrade road and drill sites <br />54v Revegetate road and drill site <br />INDIRECT COSTS <br />Colorado Division of Reclamation, Mining and Safety <br />Reclamation Cost Summary <br />Form <br />Used <br />borehole <br />ripper <br />dozer <br />revege <br />Prepared by: TK <br />Job action: MR-354 <br />Date: 5/14/2009 <br />County: Gunnison <br />Task Hours Direct Cost <br />5 $5,056 <br />0.15 $125 <br />0.83 $678 <br />1.20 $1,031 <br /> GRAND TOTAL DIRECT COSTS 7.18 $6,890 <br />Liability insurance: 2.02% % of direct costs total = $ 139 <br />Performance bond: 1.05% % of direct costs total = $ 72 <br />Job superintendent: 7.18 hrs. at $ 39.38 per hour total = $ 283 <br />Profit: 10.00% % of direct costs total = $ 689 <br /> TOTAL O & P= $ 1,183 <br /> CONTRACT AMOUNT (direct + O & P)= $8,073 <br />Financial warranty processing (legal/related costs): NA <br />Engineering work and/or bid preparation: 4.25% % of contract $ 343 <br />Reclamation management and/or administration: 5.00% % of contract $ 404 <br />NA % of direct costs <br />Total indirect reclamation costs $ 1,930 <br />Total performance bond amount (direct costs plus indirect costs) $8,820 <br />? O <br />V1 0 <br />O <br />M <br />N <br />