Laserfiche WebLink
Man' Mine - 2006 Annual Hydrology Report March 2006 <br />9.0 FUTURE MONITORING <br />During the 2006water year, monitoring activities were conducted according to methodologies and <br />procedures presented in the approved Kerr Water Monitoring Plan with reductions to the program <br />as approved by the DRMS since issuance of the Monitoring Plan. Monitoring activities in the <br />2007 water year will continue to be conducted in accordance with approved procedures. <br />Monitoring was restarted in 2005 for the deeper groundwater wells at the mine consistent with <br />monitoring requirements. This monitoring will continue through until final bond release is <br />approved or until authorization is provided by the DRMS. <br />Fde:6371/2006/2006 hydmla® tpt Page 20 <br />