Laserfiche WebLink
Marr Mine - 2006 Annual Hydrology Report <br />8.0 WELL INSPECTION <br />March 2006 <br />On April 29, 2006, the wells associated with the Kerr Monitoring Program were inspected for <br />defects and/or repair needs and total depth. The Well Inspection Report is provided in Appendix <br />A and presents the conditions found during the inspection. Table 12, Monitoring Well Depths, <br />indicates the total well depths measured in each of the prior 10 years (1997-2006). No <br />anomalous conditions were observed during the inspection. <br />TABLE 12 -MONITORING WELL DEPTHS <br /> <br /> <br /> <br />ell # 1997 <br />Total <br />Depth <br />ft 1998 <br />Total <br />Depth <br />ft 1999 <br />Total <br />Depth <br />ft) 2000 <br />Total <br />Depth <br />ft 2001 <br />Total <br />Depth <br />ft 2002 <br />Total <br />Depth <br />ft 2003 <br />Total <br />Depth <br />ft 2004 <br />Total <br />Depth <br />ft 2005 <br />Total <br />Depth <br />ft 2006 <br />Total <br />Depth <br />ft <br />79-1 181.0 180.9 180.2 180.3 179.9 179.8 179.4 178.8 178.5 176.4 <br />79-2 231.1 231.0 230.4 230.1 229.8 230.0 230.2 229.9 229.7 227.9 <br />79-3 >300 >300 >300 >300 >300 >300 >300 >300 >300 >300 <br />79-61 143.3 144.2 143.3 142.6 142.7 142.5 141.8 141.8 141.8 140.6 <br />SP-01 - - - - - 252.0 249.2 248.7 247.9 245.8 <br />AO-2A 13.2 13.4 13.4 13.4 13.3 13.3 13.2 13.1 13.0 12.8 <br />AP-1 6.7 6.6 7.4 7.3 6.9 6.9 6.9 6.9 6.8 6.7 <br />AP-2 7.2 7.2 7.2 7.2 7.6 7.6 7.6 7.6 7.3 7.3 <br />In September and October of 2002, Kerr, in cooperation with the DRMS, OSMRE, and BLM <br />completed a program to identify, plug, seal, and reclaim a number of old exploration boreholes <br />and inactive alluvial monitoring wells. None of the present monitoring sites were affected by the <br />closure activities. These wells will be abandoned following final bond release. <br />Fik: 6371/2006/ZOQfi hydrology Rc Page 19 <br />