My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-08_REVISION - M1997032 (19)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997032
>
2009-06-08_REVISION - M1997032 (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:20:26 PM
Creation date
6/10/2009 8:57:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997032
IBM Index Class Name
REVISION
Doc Date
6/8/2009
Doc Name
EPP (AM-01) Appendix A,B,C,D & E of Attachment D (part 6)
From
Denison Mines
To
DRMS
Type & Sequence
AM1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part I Page 14 of 22 <br />Permit No. COR-040000 <br />?• D. BASIC TERMS AND CONDITIONS - ALL FACILITIES (cont.) <br />b. If the evaluation shows that additional or modified BMPs are necessary, describe the type and schedule for the BMP <br />additions/revisions. A description of the SWMP changes shall be included with the next Annual or Compliance Report, <br />or if requested by the Division, whichever is sooner. <br />Discharge monitoring may also be required. The permittee may maintain coverage under the general permit provided they <br />comply with the applicable requirements outlined above. The Division reserves the right to require individual or alternate <br />general permit coverage. <br />E. REPORTING REQUIREMENTS <br />Renortin¢ <br />Annual Report for Active Mining Operations. The permittee will be required to submit an Annual Report, covering <br />January 1 through December 31 of each year, on their compliance with the SWMP. The Annual Report will contain, at <br />a minimum: <br />1) Name of permittee, address, phone number, and permit certification number. <br />2) A report on the facility's overall compliance with the SWMP. <br />3) A summary of each comprehensive stormwater facility inspection made, including date, findings, and action taken. <br />If the inspection frequency that is less than twice per year, in accordance with the allowable reduced inspection <br />frequencies in Part I.D.S.a of this permit, the Annual Report must indicate the reason. <br />4) Results and interpretation of any stormwater monitoring performed. <br />5) Certification language and signature by the permittee. (See Part I.E.5 of the permit.) <br />. The Annual Report will be due to the Division on or before February 15 of the following year. The exact due date for <br />the permittee's first Annual Report will be listed in their permit certification. The Division reserves the right to require <br />additional information in the report, on a case-by-case basis, as needed. <br />Compliance Report for Inactive Mining Operations: The permittee will be required to submit a report on the <br />compliance with the SWMP. The report shall contain, at a minimum: <br />1) Name of permittee, address, phone number, and permit certification number. <br />2) A report on the facility's overall compliance with the SWMP. <br />3) A summary of the annual inspection reports, including date, findings, and action taken, or the triennial certification <br />by a Professional Engineer (based on one or more inspections) that the facility is in compliance with the permit. If <br />the inspection frequency that is less than once per year, in accordance with the allowable reduced inspection <br />frequencies in Part I.D.S.b of this permit, the Annual Report must indicate the reason. <br />4) Certification language and signature by the permittee. (See Part I.E.S of the permit.) <br />The report will be due to the Division on or before February 15, 2011 and cover the period of time between the <br />coverage by this version of the general permit and December 31, 2010. The Division reserves the right to require <br />additional information in the report, and more frequent reports, on a case-by-case basis, as needed. <br />Annual Report for Remediation Operations: The permittee will be required to submit an Annual Report, covering <br />January 1 through December 31 of each year, on the overall compliance with the SWMP. The Annual Report shall <br />contain, at a minimum: <br />1) Name of pemrittee, address, phone number, and permit certification number. <br />2) A report on the facility's overall compliance with the SWMP, including a progress report on all remediation <br />activities. <br />3) A summary of each comprehensive stonmwater facility inspection made, including date, findings, and action taken. <br />If the inspection frequency that is less than once per year, in accordance with the allowable reduced inspection <br />frequencies in Part I.D.5.c of this permit, the Annual Report must indicate the reason. <br />4) Results and interpretation of any stormwater monitoring performed. <br />5) Certification language and signature by the permittee. (See Part I.E.S of the permit.)
The URL can be used to link to this page
Your browser does not support the video tag.