Laserfiche WebLink
COR-040000 Stormwater Management Plan <br />9. NONCOMPLIANCE NOTIFICATION (COR-040000, §II.A.3): <br />a) If, for any reason, Denison does not comply with or will be unable to comply with any <br />discharge limitations, standards, or permit requirements specified in Permit No. COR-040000, <br />except as specified in paragraph (c) below, Denison will, at a minimum, provide CDPHE and <br />EPA with the following information: <br />• A description of the discharge and cause of noncompliance; <br />• The period of noncompliance, including exact dates and times and/or the anticipated time <br />when the discharge will return to compliance; and <br />• Steps being taken to reduce, eliminate, and prevent recurrence of the noncomplying <br />discharge. <br />b) Denison will report the following instances of noncompliance orally within 24 hours <br />from the time Denison becomes aware of the noncompliance, and will mail to the CDPHE a <br />written report within five days after becoming aware of the noncompliance (unless otherwise <br />specified by the CDPHE): <br />• Any instance of noncompliance which may endanger health or the environment; <br />• Any spill or discharge of oil or other substance which may cause pollution of the waters <br />• of the state; <br />• Any discharge of stormwater which may cause an exceedance of a water quality standard. <br />C) Denison will report all other instances of noncompliance to the CDPHE in the following <br />Annual or Compliance Report. The reports will contain the information listed in paragraph (a) <br />above. <br /> <br />Van 4 Shaft SWMP 24 Denison Mines (USA) Corp.