Laserfiche WebLink
.COR-040000 Stormwater Management Plan <br />• • Rainfall measurements or estimates (in inches) of the storm event which <br />generated the sampled runoff; <br />0 The duration between the storm event sampled and the end of the previous <br />measurable storm event; <br />• An estimate of the size of the drainage area and an estimate of the runoff <br />coefficient of the drainage area; and <br />• An estimate of the total volume (in gallons) of the discharge sampled. <br />2) SampliragProcedures <br />For facilities with holding ponds or other impoundments, sampling shall be performed at <br />the outlet from the pond. If no discharge from the pond to surface waters occurs, then no <br />sampling is necessary. If any process water mixes with stormwater, all of the water is <br />considered to be process water and must be covered under a CDPS industrial wastewater <br />discharge permit. <br />All samples will be collected from the discharge resulting from a storm event that is <br />greater than 0.1 inches in. magnitude and that occurs at least 72 hours from the previously <br />measurable storm event. If the collection of a sample cannot be obtained occurring at <br />least 72 hours from the previous measurable event, the sample must be taken from a <br />storm event meeting conditions as close to these as possible, and Denison will submit <br />with the monitoring report a description of why obtaining a sample at least 72 hours <br />• following the previous measurable event was not possible. <br />The grab sample will be taken during the first thirty minutes of the discharge. If the <br />collection of a grab sample during the first thirty minutes in impracticable, a grab sample <br />can be taken during the first hour of the discharge, and Denison will submit with the <br />monitoring report a description of why a grab sample during the first thirty minutes was <br />impracticable. <br />The first two samples per discharge point must be taken between November 17, 2008 and <br />December 31, 2009, and reported to the CDPHE with the next Annual Report. <br />L <br />Van 4 Shaft SWMP 18 Denison Mines (USA) Corp.