amec <br />Earth & Environmental <br />Suitable Structural Fill material excavated from the LOB Delivery Road cuts was hauled to the <br />PSSA Embankment fill and end dumped on the fill. This material will be spread and placed at <br />a later date. <br />2) VLF, PSSA Haul Road <br />No work performed during the week. <br />3) Sediment Collection Pond <br />A CAT D-6 dozer was used to scarify the in place Soil Liner Fill material in an effort to dry <br />out the wet material and will continue next week. <br />E) Material Processing <br />1) South Cresson Clay Processing Area <br />Soil Liner Fill production for the VLF was suspended at the South Cresson Clay Processing <br />area because rain had saturated the stockpiles. This Location (tons Week Coumulative Comments <br /> <br />So Cresson Clay Processing 0 40,291 <br />Squaw Gulch Processing - 35,816 Produced and stockpiled <br />Total 0 76,107 <br />F) VLF Miscellaneous Structures <br />No work performed during the week. <br />III) Underground Working <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />Sheet 3 of 6 <br />VLF Weekly Report WE 05.30.09.D.doc