<br />amec <br />Earth & Environmental <br />compacted using a 563 vibratory smooth drum compactor. Five 24" thick wall sections had <br />been installed by the end of the week. Eleven nuclear density tests were performed with test <br />results averaging 97% of maximum dry density. Moisture-density compaction testing was <br />performed in accordance with ASTM D-1557-07. Nuclear density testing was performed in <br />accordance with ASTM D-2922 & 3017. Structural fill material was hauled from the LOB <br />Delivery Road cut using 40-ton articulating haul trucks. Structural Fill was placed in 18" to <br />24" lifts (based on rock size). After moisture conditioning the material, compaction was <br />performed using a CAT 563 vibratory smooth drum roller passing over the entire surface of <br />each lift a minimum of 4-passes. A CAT 966 front-end loader, a John Deere 35D excavator, <br />and a CAT D-8 dozer were used for final site grading. This process was performed in <br />accordance with the method specification for previously established fill testing. <br />E) Miscellaneous <br />No work performed during the week. <br />II) Underground Working <br />A) Drilling <br />Confirmatory drilling was performed using one to two track mounted rigs north of Underground <br />Working # 2016 on the southern edge of the LOB Delivery Road. An AMEC field representative <br />monitored the drilling. This process will continue next week. <br />B) Mine Shaft/Stope Remediation <br />The remediation of underground working #2016, located on the southern edge of the LOB <br />Delivery Road, was performed using a 320 track excavator to place Coarse Shaft Backfill in the <br />shaft. Approximately 63 loads of Coarse Shaft Backfill were end dumped into the shaft and stope <br />using 40-ton articulating haul trucks. The remediation of the working will continue next week. <br />Underground Working #2030 was excavated using one CAT 320 excavator to a depth of <br />approximately 20-feet exposing the end of the shaft. The underground working was backfilled <br />using the excavated material placed in 2-foot lifts and compacted using the back of the excavator <br />bucket. The top 6-feet was completed with 4-loads of Coarse Shaft Backfill delivered by a 40-ton <br />articulating haul truck. The Coarse Shaft Backfill was placed in 18 to 24-inch lifts and compacted <br />using a CAT smooth drum vibratory roller passing over the entire surface a minimum of 4-passes. <br />During backfilling of the Transfer Station #5 retaining wall, a continuation of Underground <br />Working #2040 was encountered in the north slope. The working was backfilled using Coarse <br />Shaft backfill as the backfill progressed. The shaft was excavated back to the previously placed <br />Coarse Shaft Backfill ensuring the backfill was continuous. Field observations indicated more of <br />the working could be exposed after the shot scheduled in the area. Backfilling the working will <br />continue next week after the blasting in the area is performed. <br />Sheet 3 of 9 <br />LOB Weekly Report WE 05.30.09.D.doc