Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />HOURLY EQUIPMENT COST <br />uipment Description <br />Cost Bre <br />Agency or organization name : DBMS <br />005 State : Colorado <br />05/26/2009 <br />WHE <br />Permit/job #: M-2009-024 <br />Abbreviation :none <br />Filename :M024-005 <br />Permit or other job action :112 Application Review <br />Task description : Replace OVB for Mine Areas 1 and 2 <br />Shift basis : 1 per day <br />Scraper work team -Scraper : Cat 633E Series 2 (2001) <br />-Push dozer : NA <br />Support equipment -Load area : Cat D8R Series 11 - 8SU (2005) <br />-Dump area : Cat D8R Series 11 - 8SU (2005) <br />Road maintenance -Motor grader :NA <br />-Water truck :NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />-Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer NA NA <br />% Utilization-machine : 100 NA 50 50 NA NA <br />-Ripper attachment : . NA NA 0 0 NA NA <br />Ownerhip cost/hour : $80.67 NA $50.32 $50.32 NA NA <br />Operating cost/hour : $117.98 NA $38.56 $38.56 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $24.95 NA $32.78 $32.78 NA NA <br />Unit subtotals : $223.59 NA $121.66 $121.66 NA NA <br />Number of units : 4 0 1 1 0 0 <br />Group subtotals : Work : $894.36 Support : $243.31 Maintenance : $0.00 <br />Total work team cost/hour : $1,137.68 <br />... . <br />.:::.::..... .. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 52,708 LCY factor : NA volume : 52,708 LCY <br />County: Montezuma <br />Site : Simmons Pit <br />Source of quantity take-off : (10.89ac)(43560sf/ac)(3'D) / 27 = 52, 707.6 cy <br />Source of estimated swell factor : NA