My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-02_INSPECTION - M2009024
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2009024
>
2009-06-02_INSPECTION - M2009024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:10 PM
Creation date
6/5/2009 2:13:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009024
IBM Index Class Name
INSPECTION
Doc Date
6/2/2009
Doc Name
Inspection report
From
DRMS
To
Four Corners Materials
Inspection Date
5/27/2009
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 004 State :Colorado Permit/job# M-2009-024 <br />Date <br />User <br />05/26/2009 <br />WHE <br />County : Montezuma <br />Site : Simmons Pit <br />Abbreviation :none <br />Filename :M024-004 <br />Agency or organization name: DRMS <br />Permit or other job action :112 application review <br />Task description :Rip and grade pit floor <br />. <br />. ,. . <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br />volume : 12,132 LCY factor : NA volume : 12,132 LCY <br /> <br />Source of estimated volume : (7.52ac)(43560sf/ac)(1 D) / 27 = 12,132.27 cy <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted. hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,870 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.36 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 497.48 LCY/hr <br /> Adjusted fleet production : 497.48 LCY/hr <br /> <br /> <br />JOB TIME AND COST ..:..:.:...::..: ,;.. . <br />Fleet size : 1 Dozer(s) Total job time : 24.39 Hours <br />Unit cost : $0.349 /LCY Total job cost : $4,237 <br />
The URL can be used to link to this page
Your browser does not support the video tag.