Laserfiche WebLink
TASK LIST (DIRECT COSTS) <br /> Former <br />New Task task no. <br /> Task description <br />no. or <br /> revision <br />Minnesota Creek and South of Divide Areas <br />601 44 Demolish and remove all structures in Deer Creek area <br />602 296 Regrade Deer Creek shaft 1-acre drill pad and 0.26-acre access road <br />603 TR-109 Push cuttings and purchased fill into Deer Cr. Vent and escape shafts <br />604 TR-109 Rip Deer Creek Shaft pad and access road (TR-109) <br />605 TR-109 Regrade Deer Creek shaft pad and access road (TR-109) <br />606 TR-109 Distribute topsoil on Deer Creek Shaft pad and access road (TR-109) <br />607 TR-109 Finish grade Deer Creek Shaft pad and access road <br />608 TR-108 Regrade borrow area of Monument Dam preventative measures <br />609 TR-108 Distribute topsoil on area of Monument Dam preventative measures <br />610 TR-108 Grade topsoil on area of Monument Dam preventative measures <br />Page 8 of 11 <br />MT-6, Cost Summary <br />Renewal 5 (2006) Midterm Review 6(2009) <br />2009 Task Direct Task Hours Direct Cost <br />Form Task Direct Cost Hourly cost Hours Cost (100% % Liability (Actual (Actual <br />Used Hours (CIRCES) (100 /o Liability) Remaining Liability) Liability) <br />Liability) <br />demolish n/a 10.23 $20,453 100% 10.23 $20,453 <br />dozer 7.26 $ 1,070 $830.14 7.26 $6,027 100% 7.26 $6,027 <br />dozer $830.14 14.98 $12,435 100% 14.98 $12,435 <br />ripper $856.57 1.87 $1,602 100% 1.87 $1,602 <br />dozer $830.14 9.51 $7,895 100% 9.51 $7,895 <br />loader n/a 8.06 $5,756 100% 8.06 $5,756 <br />grader $119.29 1.46 $174 100% 1.46 $174 <br />dozer $830.14 2.24 $1,860 100% 2.24 $1,860 <br />loader n/a 8.79 $2,965 100% 8.79 $2,965 <br />grader $119.29 1.46 $174 100% 1.46 $174 <br /> Total - Minnesota Creek and South of Divide Areas 65.86 $59,341