Laserfiche WebLink
Page 7 of 11 <br />MT-6, Cost Summary <br />TASK LIST (DIRECT COSTS) <br /> Former <br />New Task task no. <br /> Task description <br />no. or <br /> revision <br />Lone Pine Gulch <br />401 Demolish and remove all structures in Lone Pine Gulch area <br />402 072 Backfill Lone Pine Gulch fan bench <br />403 073 Rip Lone Pine Gulch fan pad and staging area <br />404 087 Reconstruct road through Lone Pine G. fan and staging area <br />405 095 Backfill road section to be reclaimed at Lone Pine Gulch <br />406 096 Haul material to backfill Lone Pine Gulch portals <br />407 203 Rip pads and roads associated with MR-270 <br /> Renewal 5 (2006) Midterm Review 6(2009) <br /> <br /> <br />Form 2009 <br />Task Di <br />C <br />H <br />l Task <br />Hours Direct <br />% Liability Task Hours Direct Cost <br />A <br />l <br />Used rect <br />ost <br />our <br />y cost <br />Hours C <br />(100 /o ost (100% <br />Remaining (Actual ( <br />ctua <br /> (CIRCES) Liability) Liability) Liability) <br /> Liability) <br />demolish n/a 16.26 $32,526 See sheet 16.26 $32,526 <br />dozer $830.14 63.57 $52,772 40% 25.43 $21,109 <br />ripper $856.57 1.19 $1,019 40% 0.48 $408 <br />dozer $830.14 0.24 $199 40% 0.10 $80 <br />dozer $830.14 0.24 $199 40% 0.10 $80 <br />scraped $626.35 22.62 $14,168 40% 9.05 $5,667 <br />ripper $856.57 4.52 $3,872 40% 1.81 $1,549 <br /> Total - Lone Pine Gulch 53.21 $61,418