Installation of differential pressure gauges, and connection of the pipelines to the Thickener Underflow <br />systems from the Washplant I and II Thickeners, along with associated pump controls and shut-off valves, <br />and pressure testing of the pipeline <br />Controlled backfilling and compaction of excavated material in the trench <br />Surface grading, soil material replacement, seeding with TCC's temporary stabilization seed mixture, and <br />placement of temporary BMPs to control runoff and erosion until vegetation was reestablished for all <br />project disturbance areas <br />The Thickener Underflow Borehole surface casing extends approximately 4 feet above grade, and is capped and <br />locked. The borehole casing extends approximately 310 feet into sealed and abandoned mine workings in the <br />SMD, and discharges on the mine floor, where the fines settle-out and the decant drains to the decant sump, where a <br />submersible pump recycles the water back to the surface. <br />The water is retained by coal barriers, as shown on the underground mine workings map. The barriers for the <br />refuse storage areas are minimum 250-foot wide coal barriers between the EMD and the Northern Mining District, <br />and the SMD and the Western Mining District, respectively. These barriers currently retain accumulated water <br />from mine inflows and contain a submersible pumps at the low points for mine dewatering. These pumps will be <br />used to recycle water back to the surface for Washplant make-up water or underground for dust suppression, or the <br />water will be discharged directly to Foidel Creek. TCC's existing discharge permit was modified to allow <br />discharge directly to Fish Creek. Water from the EMD and SMD is pumped to the surface at the 10-Right Borehole <br />and Fish Creek Borehole locations, respectively. <br />The water recycling/discharging system required minor changes to the existing water distribution system. Water <br />pumped from the mine exits the mine at Site 109. From this point, the water is piped to the Area 1 Pit where it is <br />retained to allow for settling of sediments and aeration. A pump station has been installed towards the south end of <br />the pit. Installation involved burying forty-foot beams under the road and extending them over the pit. A platform <br />was constructed on the beams extending over the pit. A submersible pump, along with hosing and piping, is <br />suspended from the platform into the pit. A winch installed on the platform assists in setting the pump at the <br />desired elevation. A second pump was added to provide make-up water for Washplant II. Control equipment for <br />this second pump was installed at the existing pump platform location <br />The water pumped from the Area 1 Pit can go in one of four directions, or a combination of them: 1) Pit to <br />Washplant I; 2) Pit to Washplant II; 3) Pit to mine water recycling line; and/or 4) Discharge to Foidel Creek. The <br />water pumped from the pit is piped to a de-sander, located at an old well site. From this point it is piped to one or <br />both of the washplants or piped over and tied into the existing mine water line. Aline has been installed from the <br />de-sander back to the pit so that the back-flush water can be returned to the pit. The location of the lines is shown <br />on Map 24. The trenches were dug with a backhoe or trackhoe. During the excavation process suitable plant <br />growth media was removed and windrowed adjacent to the trench and then replaced on top of the subsoils returned <br />to the trench. <br />MR08-233 2.05-97.4 ~j ,y~ ~ 12/09/08 <br />::.tY Na ,~/ ~ :: <br />