My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-19_PERMIT FILE - C1982056A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2009-02-19_PERMIT FILE - C1982056A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:43 PM
Creation date
6/4/2009 10:45:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
2/19/2009
Doc Name
Pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Previously, during evaluation of the CRDA, as permitted under TR 15, a chemical analysis of the processed waste <br />material was completed, with the results presented as Table 20A, Waste Material Analysis. Based upon this <br />analysis, it appears the refuse materials are not potentially toxic-forming or acid-generating. The previously <br />referenced CTL/Thompson report addressing the CRDA design and geotechnical evaluation includes a conservative <br />estimate of the maximum quantity of water projected to drain from within the pile (see Exhibit 26A, page 17). The <br />estimate is based upon the assumption that 3 inches of water infiltrates into and discharges from the pile on an <br />annual basis. The analysis further assumes that discharge from the pile occurs during aone-month time period. <br />Under these conditions, the average calculated flow from the drain is 0.2 cfs for the month drainage occurs. The <br />discharge from the refuse pile rock drain will be routed to Pond D. Given the very limited volume of rock drain <br />discharge relative to the surface water runoff contributions typically received by Pond D, no adverse water quality <br />impacts are anticipated as a result of construction of the waste pile. Pond D will continue to be monitored for the <br />applicable NPDES discharge permit parameters as required. <br />The permanent diversion ditches on and around the perimeter of the CRDA (see Map 24 and Exhibit 26A, <br />Appendix D) were established prior to constructing the refuse pile. The uppermost portion of the west side <br />diversion ditch segment RDA-lb, however, was temporarily aligned slightly to the east of the location depicted on <br />Map 24 in order to avoid the established topsoil stockpile (SF-6) in this area (see Exhibit 26A, Figure 2). Topsoil <br />Stockpile SF-6 remained in its original location and will be utilized as the initial topsoil source for reclamation of <br />the refuse pile benches. In the event Topsoil Stockpile SF-6 has not been reduced through topsoil replacement to <br />the degree necessary to allow construction of the final configuration of ditch RDA-lb once the pile is developed to <br />this elevation, any portion of Topsoil Stockpile SF-6 conflicting with the fmal ditch alignment will be relocated and <br />the permanent diversion ditch will be established between the existing sections. TCC does not intend to riprap the <br />temporarily located portion of Ditch RDA-lb, but will riprap the ditch when the fmal alignment is established. <br />In order to facilitate the establishment of vegetation in permanent diversion Ditch RDA-2, temporary rock check- <br />dams will be installed in selected segments of the ditch. The design of these rock check-dams can be found in <br />~ Exhibit 26-a(1), Refuse Pile, Rock Check-Dam design. It should be noted that these dams will not exceed one foot <br />in height, and extend across the 8-foot wide ditch bottom. The 12-foot rock dams will extend up the ditch <br />sideslopes to the flow-line. The rock check-dams will be placed according to the following spacing interval: Slopes <br />1 percent or less -every 100 feet, 2 percent slope -every 50 feet, 3 percent slope - 3 dams per 100-foot segment of <br />ditch, 4 percent slope - 4 dams per 100-foot segment of ditch, 5 percent slope - 5 dams per 100-foot segment of <br />ditch, and 8 percent slope - 8 dams per 100-foot segment of ditch. <br />Temporary diversion ditches designed to convey the 100-year, 24-hour storm runoff will be cut-in approximately <br />50 feet upslope from the working area of the CRDA as pile construction progresses. The temporary ditches will be <br />established in areas stripped of topsoil, and are intended to divert surface runoff away from the exposed coal waste <br />materials during construction of the pile. TCC estimates a maximum of six temporary ditches will be established <br />throughout the life of the pile. <br />Coal Refuse Disaosal Area Modification (TR95-21, TR05-49, MR08-2331 <br />The CRDA construction sequence and final grading are modified as reflected in Exhibit 26A-1. The modification <br />of the construction sequence and final grading will result in a stable refuse pile configuration in accordance with the <br />requirement of the DMG regulations. The bench ditch design is presented in Exhibit 8M. It should be noted the <br />bench design is adequate to pass runoff from the 100-year, 24-hour event. <br />All of the provisions provided in Exhibit 26 will continue to be followed by TCC, except as modified by Exhibit <br />26A-1. The modification presented in Exhibit 26A-1 can be summarized as follows: <br />1) Segmented Construction -The requirement to place and compact the fill in 24-inch lifts will be followed, with <br />testing of every other lift to verify compaction requirements are met. The southern portion of the CRDA will be the <br />~ primary temporary stockpiling area, although the entire footprint of the pile can be used for temporary stockpiling <br />of refuse material to allow for temporary storage of material during the winter, when adequate compaction may not <br />be feasible, and to allow water to drain from the refuse.prior to placement and compaction. <br />MR08-233 2.05-97 ~~~~'~,r~s"~~ ~~~ ~ `-~ `V'~~''`~~ 12/04/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.