My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-19_PERMIT FILE - C1982056A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2009-02-19_PERMIT FILE - C1982056A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:43 PM
Creation date
6/4/2009 10:45:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
2/19/2009
Doc Name
Pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NMD (Panels 12-Right through 16-Right, PR 99-051 <br />The geology description provided in PR-03 is also applicable for the NMD. One item to note is that TCC <br />discontinued pumping from the Fish Creek Borehole for a period of approximately 18 months. When pumping <br />recommenced the total recoverable iron and total dissolved solids concentrations increased to approximately 17 <br />mg/1 and 7,200 mg/1 respectively. TCC is applying caustic soda to reduce the total recoverable iron concentration <br />as per its CDPHE discharge permit. TCC believes the elevated concentrations are the results of the water <br />stagnating in the underground sump. Once this pool of water is discharged, TCC believes the concentration will <br />return to levels previously reported for the Fish Creek Borehole. TCC will continue to monitor the concentration, <br />and anticipates the concentration to return to historic levels by late summer, 2000 or 2001. <br />In regards to future impacts, TCC will not discontinue pumping of the underground sump for extended periods of <br />time. This will eliminate the potential for the above situation to occur in the future. Once mining is completed at <br />the facility, no further discharging will occur. Based upon this, there should be no impact to the postmining land <br />use. <br />Coal Refuse Disposal Area (CRDA TR92-15 TR95-21 MR08-233) <br />The Coal Refuse Disposal Area (CRDA), located to the southwest of the Area 1 Pit, as shown on Map 24, Surface <br />Facilities, has been designed to hold approximately 3,000,000 cubic yards of material. The CRDA is designed to <br />accommodate temporary placement and permanent disposal of coal refuse materials generated from the preparation <br />plant, excess coal development waste material from the mine, or a combination of preparation plant and mine waste <br />material. This material or combination of materials will be hauled to the pile using either TCC's existing mobile <br />equipment fleet or contractor equipment. The original design of the CRDA was contracted to CTL/Thompson. The <br />design was revised and updated to reduce the overall footprint and address operational placement and final grading <br />concerns, by Northwest Colorado Consultants. Both the original design and revisions are documented in Exhibits <br />26A, 26A-1, and 26A-2. Within 30 days of start-up of the preparation plant, a sample of the waste material <br />generated from the preparation plant was obtained and analyzed to verify the assumptions used for the pile design <br />presented in Exhibit 26A. TCC forwarded results of this analysis to the Division along with a certified statement <br />from a registered P.E. summarizing the results of the analyses as compared to the original design assumptions. The <br />surface runoff/diversion system design for the pile was developed in-house by TCC and is presented as Appendix D <br />to the CTL/Thompson Report. The locations of the CRDA and associated drainage features are shown on Map 24, <br />Surface Facilities. <br />As shown on Exhibit 26A, Figure 1, the CRDA is constructed west of the reclaimed valley to the west of the Area 1 <br />Pit. Prior to construction, approximately 18 inches of topsoil from within the pile footprint were removed and <br />placed in topsoil stockpile SF-12 (see Map 29). During reclamation of completed pile benches, suitable cover <br />materials and topsoil will be redistributed over the face of the pile. Direct placement of topsoil will occur to the <br />extent possible during the bench reclamation/pile extension process. It is anticipated that topsoil replacement will <br />stay one bench below the active working zone of the pile. During construction of the CRDA, inactive portions of <br />topsoil stockpile SF-12 will be seeded with the topsoil stabilization seed mixture at the first appropriate opportunity <br />following stockpiling operations. Table 49A, Topsoil Stockpile Summary, has been revised to show the potential <br />modification to the existing stockpile SF-12 resulting from the construction of the refuse pile. Also, the table <br />presents information for all other Twentyrnile topsoil stockpiles. The stockpile identification numbers in the table <br />correlate with the stockpile designations presented on Map 29. <br />SpoiUsubsoil material will be used as suitable, non-toxic cover, to be placed over completed refuse benches prior to <br />topsoil replacement. During development of the refuse pile, spoiUsubsoil material will be selectively removed from <br />within the footprint of the pile. The spoiUsubsoil will normally be hauled directly to an active reclamation area and <br />spread over the completed refuse bench. In cases where direct placement is not operationally feasible, cover <br />materials may be temporarily stockpiled within the pile footprint or in adjacent areas. After placement of the <br />spoil/subsoil material, the area will be topsoiled, as previously described. Redistributed topsoil will be seeded with <br />the pastureland seed mixture. <br />MR08-233 2.05-96 ~~~~~~~ ~~~ ? `'~ ~~~~~~~ 12/04/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.