My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-31_GENERAL DOCUMENTS - C1994082 (3)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1994082
>
2008-03-31_GENERAL DOCUMENTS - C1994082 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 3:19:15 PM
Creation date
6/3/2009 2:24:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
3/31/2008
Doc Name
Midterm Permit Review Findings
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />i <br />MR27 NPDES Permit Renewal <br />MR26 Reference Area for Haul Road A <br />SLO1 Phase 1 Bond Release North Pit Area <br />TR31 Haul Road A Reference Area <br />Culvert Design for Unimproved Road on <br />TR32 Maneotis Property <br />TR30 Sediment Pond 010 Revised Capacity <br />Approved 12/18/2006 <br />Withdraw 02/09/2007 <br />Approved <br />Approved <br />Approved <br />Approved <br />TR34 Hydrology Monitoring Program Changes Approved <br />TR33 Reduction in Wildlife Monitoring Approved <br />03/06/2007 -$11,862.00 <br />04/12/2007 <br />04/25/2007 $431.00 <br />06/01/2007 <br />06/29/2007 <br />07/10/2007 <br />TR35 Postmine Channel YPM-21 Design Approved 09/27/2007 $37,692.00 <br />Sediment Pond 012A Design, Supplemental <br />Channel Desings using Turf Reinforcement <br />Mat, and Dragline Deadhead Route Channel <br />TR-36 Section Reconstruction Approved 01/16/2008 $22,789.00 <br />A new reclamation cost estimate is being prepared by the Division for the 2008 Midterm <br />Review for the Yoast Mine. The revised cost estimate will be forwarded to SCC as soon as <br />it is completed. The current bond amount held is $5,200,000.00. If the midterm <br />reclamation cost review indicates a liability higher than the current bond held, submittal of <br />additional bond will be required. <br />SECTION III - STATUS OF STIPULATIONS <br />Since the submittal of the original permit application there have been a total of eighteen <br />stipulations issued. Seventeen of these stipulations were issued prior to the permit renewal <br />decision date of August 2, 2005. All of these stipulations have been terminated or complied <br />with. One new stipulation was added with Permit Revision No. 2 in 2006 since the time of the <br />last permit renewal. This stipulation is listed below. This stipulation has also been complied <br />with. A complete list of all stipulations is provided in the Proposed Decision and Findings of <br />Compliance for Permit Revision No. 2 dated February 28, 2006. <br />STIPULATION NO. 18 <br />BY NO LATER THAN MARCH 15, 2007, THE OPERATOR WILL SUBMIT A COMPLETE <br />TECHNICAL REVISION APPLICATION THAT WILL DESCRIBE THE HISTORIC <br />RECORD BASED HERBACEOUS PRODUCTION STANDARD FOR NON-CROPLAND <br />3
The URL can be used to link to this page
Your browser does not support the video tag.