My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-01_REVISION - C1996083 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-06-01_REVISION - C1996083 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:09 PM
Creation date
6/2/2009 2:41:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
6/1/2009
Doc Name
Memo Regarding Cost Estimate
From
Jim Stark
To
Joe Dudash
Type & Sequence
MR104
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C-1996-083 <br />Minnr Ravi6nn 100 <br />-------- - -- <br />PROJECT IDENTIFICATION ------- - - - <br />Date : 01-Jun-09 Permit C-1996-083 Site: Bowie No. 2 Mine <br />User: JRS State : Colorado <br /> Filename: C083-350 County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Minor Revision 104 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />351 Regrade Drill Pad 192 10.69 $2,219 <br />352 Regrade New Road Spur to Drill Pad 192 27.79 $5,768 <br />353 Replace Topsoil from Stockpile to Drill Pad 192 5.75 $1,194 <br />354 Replace Topsoil from Stockpile New Road Spur to Drill Pad 192 14.55 $3,020 <br />355 Reseed Drill Pad 192 2.10 $1,437 <br />356 Reseed New Road Spur to Drill Pad 192 5.40 $3,695 <br /> <br /> Direct Cost Total 66.28 $17,333 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (1.55% of Direct Costs) $269 <br /> Performance Bond (1.05% of Direct Costs) $182 <br /> Job Superintendent (at $42.25/hour) 33.14 $1,400 <br /> Profit (10.00% of Direct Costs) $1,733 <br /> <br /> <br /> Total Overhead and Profit $3,584 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $20,917 <br /> <br /> <br /> Legal - Engineering - Project Mana eg_ ment <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $889 <br /> Reclamation Management and Administration (3.25% of Contract) $680 <br /> <br /> <br /> TOTAL BOND AMOUNT $22,486 <br />jrs Page 1 01-06-09
The URL can be used to link to this page
Your browser does not support the video tag.