My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-02_PERMIT FILE - M2009042
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009042
>
2009-06-02_PERMIT FILE - M2009042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:12 PM
Creation date
6/2/2009 2:21:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009042
IBM Index Class Name
PERMIT FILE
Doc Date
6/2/2009
Doc Name
New 112c application
From
Montrose County
To
DRMS
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table E-1 Reclamation Quantities <br />Overburden Removed CY 201,667 <br />Topsoil Removed CY 40,333 <br />Topsoil Reclaimed CY 5,324 <br />Topsoil - Berm CY 7,524 <br />Net To soil CY 27,485 <br />The amount of topsoil proposed to be disturbed is 40,333 CY as shown in Table E-1. All <br />calculations have assumed a topsoil thickness of 12 inches. If the topsoil depth changes as the pit <br />advances, then the amount of topsoil left in the piles will vary. The berm along the east side of <br />the pit will remain in place after reclamation to contain runoff in the industrial yard. <br />3. Haul Roads and Access <br />The mine access road will be built along the west side of the site, connecting to LaSalle Road to <br />the south. This access road will not be reclaimed at the end of mining to allow access through the <br />site. The industrial yard will be accessed by a second road that will be built at the south end of <br />the site once Phase 1 is mined out. <br />4. Reclamation Timetable <br />The timetable for reclamation is shown below in Table E-2. Exhibit L: Reclamation Costs <br />describes the worst case bond scenario. <br />Table E-2 Reclamation Timetable <br />Task Comments Time Required <br />(months) <br /> <br />l . Site preparation: Initial topsoil stripping and <br />installation of processing facilities <br />1.5 <br />2 Mining of Phase 1 93.6 <br />3 Reclaim Phase 1 and construct industrial yard 3.0 <br />4 Mine Phase 2 366.0 <br />5 Reclaim Phase 2 3.0 <br />Total (months) 467.1 <br />Total (years) 38.9 <br />0 <br />0 <br /> <br />LaSalle Pit, April 09 E-2