My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-28_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-05-28_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
5/29/2009 12:06:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
5/28/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- Week of 5/3/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amen <br />Earth & Environmental <br />III) Storm water Management Structures <br />A) LOB Stormwater Culverts <br />No work performed during shift. <br />B) Roadside ditch <br />No work performed during shift. <br />C) Best Management Practices (BMP) <br />All silt fencing is in place. Best Management Practices are performed throughout the LOB project. <br />IV)LOB Pad Geosynthetics <br />A) LLDPE Geomembrane 80 and 100 mil LLDPE <br />All work has been completed per the project specifications. <br />CQA ACTIVITIES: <br />SUMMARY: <br />Field Observation Summary <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />Underground working 2030 was backfilled during excavation in the cut area for safety. <br />Continue throughout the week to observe fill placement on the LOB Pad and LOB Delivery Road. <br />Conveyor Transfer Station #5, retaining wall concrete: Three test specimens were cast for compressive <br />strength. <br />Laboratory Testing Summary <br />Laboratory testing continues (Gradations, Atterberg Limit, and Moisture-Density Relationships) for <br />previously sampled materials, throughout the week. <br />Gradation test results on two samples of Drain Cover Fill (record tests). Drain Cover Fill meets the <br />project specification grading requirements. <br />Gradation test results on representative samples of structural fill from the LOB cut areas were completed <br />on three samples. Test results indicate greater than 30% rock was retained on the 3/4 -inch screen. <br />Method specification compaction is applicable for the materials tested. <br />Concrete cylinders have been delivered to an off site-testing laboratory for compressive strength testing. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No Concerns <br />Sheet 4 of 10 <br />LOB Weekly Report WE 05.09.09.D
The URL can be used to link to this page
Your browser does not support the video tag.