My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-26_REVISION - C1996083 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-05-26_REVISION - C1996083 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:56 PM
Creation date
5/28/2009 9:50:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
5/26/2009
Doc Name
Adequacy Review
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
MR105
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C-1996-083 <br />Minor Revision 105 <br />PROJECT IDENTIFICATION <br />Date : 26-May-09 Permit C-1996-083 Site: Bowie No. 2 M ine <br />User: JRS State : Colorado <br /> Filename: C083-330 County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Minor Revision 105 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />331 Plug and Seal Gob Vent Borehole GVB-8-TG 8.00 $3,280 <br />332 Regrade Drill Pad 9.58 $1,990 <br />333 Replace Topsoil from Stockpile to Drill Pad 4.38 $909 <br />334 Reseed Drill Pad 2.10 $1,437 <br /> <br /> <br /> Direct Cost Total 24.06 $7,616 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (1.55% of Direct Costs) $118 <br /> Performance Bond (1.05% of Direct Costs) $80 <br /> Job Superintendent (at $42.25/hour) 12.03 $508 <br /> Profit (10.00% of Direct Costs) '$762 <br /> <br /> <br /> Total Overhead and Profit $1,468 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $9,084 <br /> <br /> <br /> Le ag 1- Engineering - Project Management <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $386 <br /> Reclamation Management and Administration (3.25% of Contract) $295 <br /> <br /> <br /> <br /> TOTAL BOND AMOUNT $9,765 <br />jrs Page 1 26-05-09
The URL can be used to link to this page
Your browser does not support the video tag.