COR-030000 Stormwater Management Plan <br />4. FINAL STABILIZATION (H.C.4.) <br />a) Description of Final Stabilization Practices (§I.C.4.a) and Methods (§I.C.4.b) <br />Final stabilization includes those measures taken to control pollutants in stormwater after soil <br />disturbing activities are complete. At closure of the mines, the site will be restored in <br />accordance with the mining permit reclamation plan. Project reclamation will include <br />regrading of the steeper slopes to achieve long-term stabilized slopes. The slopes will then <br />be covered with the stockpiled topsoil, contour ripped, and seeded to create a vegetative <br />cover that minimizes erosion. The WRA will be contoured, provided with a topsoil cover <br />and re-vegetated. Seed mix selection will consist of naturally occurring vegetation for the <br />surrounding area approved by the BLM, and will be applied using the methods described in <br />Section 3.c)2)ii of this SWMP. Erosion and sediment control BMPs will be maintained until <br />final stabilization is achieved. <br />b) Final Stabilization Achievement (§I.C.4.c) <br />Final stabilization is achieved when all ground surface disturbing activities at the site have <br />been completed and uniform vegetative cover has been established with an individual plant <br />density of at least 70 percent of pre-disturbance vegetative cover, or equivalent permanent, <br />physical erosion reduction methods have been employed. When final stabilization is <br />achieved, temporary erosion and sediment control measures will be removed. <br /> <br /> <br />Denison Mines (USA) Corp. Sunday Mines SWMP <br />22