My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-19_REVISION - M1977285 (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2009-05-19_REVISION - M1977285 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:02 PM
Creation date
5/27/2009 2:32:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
REVISION
Doc Date
5/19/2009
Doc Name
EPP amendment (AM-03) SWMP appendix A,B & C (part 6)
From
Denison Mines
To
DRMS
Type & Sequence
AM3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. COR-030000 Stormwater Management Plan <br />• The washout site must be temporary (less than 1 year); <br />• The washout site may not be located in an area where shallow groundwater <br />may be present, such as near natural drainages, springs, or wetlands; and <br />• Upon termination of use of the washout site, accumulated solid waste, <br />including concrete waste and any contaminated soils, must be removed from <br />the site to prevent on-site disposal of solid waste. <br />iii) Portable sanitary facilities <br />Where needed, portable sanitary facilities will be provided in convenient, level <br />locations away from traffic areas, paved surfaces, drainage areas, or retention areas. <br />A licensed company will be hired to maintain and clean the units, inspect for any <br />deficiencies, and keep the units in good working order. Portable sanitary facilities <br />will be adequately anchored to prevent tipping over. <br />,Q) Groundwater aadSmrwwaderDewWering (§/.. C.I e)d) <br />The Water Quality Control Division's General Permit for Stormwater Discharges <br />from Construction Activities allows for dewatering of groundwater and stormwater to <br />the ground surface to allow for infiltration on the site. No groundwater from <br />construction dewatering will be discharged as surface runoff or to surface waters on <br />the site. It is not anticipated that dewatering activities will be required during this • <br />project. However, if dewatering becomes necessary, groundwater and/or stormwater <br />may be pumped from excavations or trenches to the ground surface on the site for <br />infiltration or evaporation. The location of pumping and deposition of the <br />groundwater or stormwater will be marked on the site plan prior to the start of <br />pumping activities. If it becomes necessary to pump groundwater off site then a <br />groundwater discharge permit must be obtained from the State prior to engaging such <br />activities. <br />i <br />V <br />Denison Mines (LISA) Corp. Sunday Mines SWMP <br />21