Laserfiche WebLink
Form No. OFFICE OF THE STATE ENGINEER <br />GWS-25 COLORADO DIVISION OF WATER RESOURCES <br />818 Centennial Bldg., 1313 Sherman St., Denver, Colorado 80203 <br />(303) 86&•3581 <br />APPLICANT <br />DENISON MINES USA CORP <br />105017TH ST <br />STE 950 <br />DENVER, CO 80211- <br />(303)628-7798 <br />EXST <br />WELL PERMIT NUMBER 66209 - F <br />DIV. 7 WD 71 DES. BASIN MD <br />APPROVED WELL LOCATION <br />SAN MIGUEL COUNTY <br />NE 1/4 SW 1/4 Section 14 <br />Township 44 N Range 18 W New Mex P.M <br />DISTANCES FROM SECTION LINES <br />3650 Ft. from North Section Line <br />2025 Ft. from West Section Line <br />UTM COORDINATES (Meters.Zone:13,NAD83) <br /> <br /> <br />ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT <br />CONDITIONS OF APPROVAL <br />1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit <br />does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from <br />seeking relief in a civil court action. <br />2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402-2, unless approval <br />of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation <br />Contractors in accordance with Rule 18. <br />3) Approved pursuant to CRS 37-90-137(2) for the construction of a well to divert ground water tributary to Big Gypsum Creek, <br />a tributary of the Dolores River, at a point where unappropriated water is available for withdrawal. <br />4) The pumping rate of this well shall not exceed 0.83 GPM. <br />5) The average annual amount of ground water to be withdrawn shall not exceed 1.34 acre-feet. <br />6) The use of ground water from this well is limited to industrial purposes in an underground mine including dust <br />suppression. <br />7) The approval of this permit does not grant a water right. This well is subject to administration by the Division Engineer in <br />accordance with applicable decrees, statutes, rules, and regulations. <br />8) This well shall be not more than 200 feet from the location specified on this permit and more than 600 feet from any <br />existing well, completed in the same aquifer, that is not owned by the applicant. <br />9) A metering method must be established for this well which is satisfactory to the Division Engineer. <br />10) The pump shall bet installed and maintained in accordance with variance no. 2007-117A, granted by the Board of <br />Examiners of Water Well Construction and Pump Installation Contractors on September 6, 2007. <br />NOTE: This well may be subject to administration in the water rights priority system in the future. It is recommended that a <br />water court decree be obtained to affirm the priority of the well. q J?/opt <br />APPROVED <br />CDK 1?/OAL <br />1^?. <br />For State Engineer By <br />Receipt No. 3620165 DATE ISSUED 09-06-2007 EXPI TION DATE v\)/A <br />• <br />• <br />1.