My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-19_REVISION - M1977285 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2009-05-19_REVISION - M1977285 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:02 PM
Creation date
5/27/2009 2:26:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
REVISION
Doc Date
5/19/2009
Doc Name
EPP (AM-03) Att. C: Other Agencies; Att. D: Air Permit; Att. E: Well Permit; Att. F: SWMP (part 5)
From
Denison Mines
To
DRMS
Type & Sequence
AM3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
immediately contact manager or mine superintendent, and environmental manager. 0 <br />3. The Operator would dispose of used recovery materials appropriately. <br />4. The Operator would keep fuel Logs of refueling activities for all refueling activities. <br />The Operator would provide refueling contractors with fuel unloading procedures and <br />guidelines. <br />5. The Operator would inspect and test buried oil-containing lines if they were exposed. <br />If piping is removed from service or in standby, the Operator would bank-flange and <br />mark them at terminal or transfer point. <br />6. The operator would inspect secondary containments after a rain event, including rain <br />events resulting in water released from diked area via pump. <br />7. The Operator would conduct visual inspections of aboveground pipes, valves, <br />appurtenances, bulk storage tanks, containments and portable oil storage on a <br />monthly basis. <br />8. The operator would conduct bulk storage tank integrity testing every 10 years. <br />9. The Operator would maintain all records in the SPCC plan book at the mine site for at <br />least 3 years. <br />10. The operator would conduct annual training for individuals responsible for oil- <br />handling. Completion of training would be recorded and maintained within the SPCC <br />plan book for 3 years. <br />11. The Operator would place fuel tanks in plastic lined secondary containment area or • <br />equivalent. <br />12. The Operator would store waste products of these chemicals, collected as a result of <br />routine vehicle and equipment maintenance, in steel drums in the maintenance shop, <br />or within a plastic and earthen lined bermed area. The drums would be picked up on <br />a periodic basis by a contractor. <br />Groundwater <br />1. Denison must provide monthly reports on the status of the characterization and <br />geohydrologic studies, and fate and transport models to the BLM. <br />2. Denison will provide quarterly reports on monitoring date from all groundwater <br />monitoring wells. Water quality will be tested for any potential leachates that are <br />identified :in the characterization tests. An annual summary report will be provided to <br />the BLM. <br />Bond <br />1. Dension has their bond update. An adequate financial guarantee, accepted by the <br />BLM, must be in place before work may begin. <br />i. <br />A-10
The URL can be used to link to this page
Your browser does not support the video tag.