My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-19_REVISION - M1977285 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2009-05-19_REVISION - M1977285 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:02 PM
Creation date
5/27/2009 2:26:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
REVISION
Doc Date
5/19/2009
Doc Name
EPP (AM-03) Att. C: Other Agencies; Att. D: Air Permit; Att. E: Well Permit; Att. F: SWMP (part 5)
From
Denison Mines
To
DRMS
Type & Sequence
AM3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 12. Public access to the mine site would be precluded in order to eliminate public <br />safety concerns. <br />13. Composite samples shall be acquired through quarterly waste rock grab samples <br />and analyzed once per year to ensure that the waste is still considered inert. This <br />data and a summary report shall be provided to the BLM. <br />14. If characterization studies indicate that the waste rock material is not inert, a <br />monitoring plan will be submitted to the BLM. <br />Stormwater Management <br />1. Operator would implement stormwater management plan. <br />2. Operator would conduct inspections of stormwater BMPs implemented on site at least <br /> monthly, and within 24 hours after the end of any precipitation or snowmelt event <br /> that causes surface erosion. For sites where final stabilization has not been achieved, <br /> the Operator would inspect the stormwater management system at least once every <br /> month. <br />3. The Operator would follow and review Best Management Practices (BMPs) as <br /> outlined in the stormwater management plan (SWMP). <br />• 4. The Operator would inspect the stormwater management system at active mines least <br />twice per year (spring and fall) or more frequently if specified in the plan, and <br /> document in the annual report submitted to CDPHE by February 15th of the <br /> following year. <br />5. The Operator would inspect the stormwater management system at inactive mines at <br /> least once per year, and document in the compliance report submitted to CDPHE by <br /> February 15th of the following year. <br />6. The Operator would provide spill response and reporting as specified in the Spill <br />Prevention Control and Countermeasure (SPCC) and SWMP Plan. <br />7. The Operator would conduct training its personnel and subcontractors on spill <br />response and cleanup, good housekeeping practices, and the proper use and storage of <br />materials. <br />8. The Operator would revise SWMP when there is a change in design, construction, <br />operation, or maintenance of the site, if the SWMP proves to be ineffective in <br />controlling pollutants in stormwater discharges, or when BMPs are no longer <br />necessary and are removed. <br />Spill Prevention Control and Countermeasures <br />1. The Operator would implement the Spill Prevention Control and Countermeasures <br />(SPCC) Plan it prepared for operations. <br />2. If a spill occurs, the Operator would account for the safety of all workers and <br />• <br />A-9
The URL can be used to link to this page
Your browser does not support the video tag.