Laserfiche WebLink
Section 2 <br />Methodology <br />• <br />TEL 1. fl A IKA-ww -i 0w11 -4 wi Cw1?r?1wM 11-1 <br />• <br />Soil Sample <br />Identification Batch Sample <br />Identification Volume of Solution <br />(ml-) Mass of Soil Ratio <br />mL: <br /> CDM-DEN-001 999.9 250.7 4 <br /> CDM-DEN-002 1003.1 100.4 10 <br />DM-WMV4 CDM-DEN-003 1001.9 50.7 20 <br /> CDM-DEN-004 764.8 20.8 40 <br /> CDM-DEN-005 753.1 13.1 60 <br /> CDM-DEN-006 991.4 253.1 4 <br /> CDM-DEN-007 1003.2 102.6 10 <br />DM-WRWS CDM-DEN-008 994.6 51.3 20 <br /> CDM-DEN-009 538.2 12.9 40 <br /> CDM-DEN-010 515.2 8.2 60 <br /> CDM-DEN-011 1013.3 251.4 4 <br /> CDM-DEN-012 1004.5 100 10 <br />DM-SJ CDM-DEN-013 1001.2 50.2 20 <br /> CDM-DEN-014 899.8 22.7 40 <br /> CDM-DEN-015 902.6 15.5 60 <br /> CDM-DEN-016 992.5 251.1 4 <br /> CDM-DEN-017 1015.3 103 10 <br />DM-TP CDM-DEN-018 997 52.1 20 <br /> CDM-DEN-019 751.8 20.1 40 <br /> CDM-DEN-020 753.2 13.4 60 <br /> CDM-DEN-021 998.3 252 4 <br /> CDM-DEN-022 987.2 104.3 10 <br />DM-SV CDM-DEN-023 997.8 50.3 20 <br /> CDM-DEN-024 984.2 26.2 40 <br /> CDM-DEN-025 752.3 12.2 60 <br />2.3 Data Presentation <br />The adsorption of metals to the soil (mg/kg) was not measured directly due to the <br />inherent heterogeneity of material; but was instead calculated using the following <br />mass balance relationship: <br />x (mg / kg) _ [C3. (mg / L) - Cfi.i (mg / L)l * V sDID (L) <br />M M soil (kg) <br />Where: <br />x/m (mg/kg) = Concentration of metal adsorbed <br />C9taft(mg/L) = Initial concentration of metal in the leachate (before <br />adsorption test) <br />Cs„w(mg/L) = Final concentration of metal in the leachate (after <br />adsorption test) <br />M.il(kg) = The dry mass of soil used in the batch <br />Vsoln(L) = The volume of leach solution used in the batch <br />• <br />The x/m absorption concentration values were plotted versus the final concentrations <br />to generate isotherms. The slope of the linear portion of the isotherm curves are then <br />used to estimate the partition coefficient (Kd). <br />cm 2-3 <br />T:%498643enis- Min"%Task Order 3. DMO Sampling and Analysis Plan\Task 3.12 - Soil, Ore, Roek Data Assessment ReporMunday Rods ReporOAftechmentsVdtenuation Repod_"rking draft 040309.dm