Laserfiche WebLink
MODIFICATION 05-2009 <br />Form 2 - Public <br />Exhibit C AMSO Notice of Intent P-2008 - 046 Supplemental Information <br />Construction Details <br />NO CHANGE <br />Proposed Access Roads <br />A second access road is required for the Test Pad for safety and construction reasons. This access <br />road, shown on Figure A.2 as well as Figure 4-6 in Volume 1 of the POD, will be constructed the <br />same as the initial access road to the Test Pad: travel surface 22 feet wide, built up about two feet <br />above grade with base material, and surfaced to provide all weather travel. Since the original <br />ground surface is nearly level and the road will be built above grade, no ditches are proposed. <br />This second access road to the Test Pad will be 325 feet long outside of the security gate and, <br />considering outside slopes and the flare at the entrance on BLM Road 1019, will create 0.3 acres <br />of disturbance. <br />Proposed Drill Pads <br />The Test Pad must be enlarged to accommodate the surface facilities, a septic leach field in the <br />southwest corner, propane tanks in the northeast corner, and an incinerator on the east side. The <br />final configuration of the Test Pad is shown in Figure A.2 and in Figure 4-6 in Volume 1 of the <br />POD. The size of the Test Pad increases by 0.8 acres to 5.2 acres. <br />No other surface disturbances are proposed. <br />Waste Containment and Disposal <br />NO CHANGE <br />Reclamation <br />NO CHANGE