My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 5/26/2009, 3:19:17 PM-MR1
DRMS
>
Public
>
REVISION - 5/26/2009, 3:19:17 PM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:56 AM
Creation date
5/26/2009 3:23:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
5/19/2009
Doc Name
Modification to Existing NOI (non-confidential)
From
American SHale Oil, LLC
To
DRMS
Type & Sequence
MD2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MODIFICATION 05-2009 <br />Form 2 - Public <br />Exhibit C AMSO Notice of Intent P-2008 - 046 Supplemental Information <br />Section III PROJECT DESCRIPTION <br />5. Describe proposed surface excavations or other land disturbance, including roads, <br />pits, trenches, waste piles, drill pads and collar areas of undereground workings, <br />ponds, etc... <br />The following information is presented in accordance with the requirements set forth in the <br />NOI application Section 11I, 5. and the Surface Use Plan required by the BLM for the <br />Application to Drill or Reenter <br />Site Location and Background <br />NO CHANGE <br />Location of Proposed Surface Disturbance <br />The surface disturbance which has been completed to date in accordance with the approved NOIs <br />consists of: <br />• Construction of the Test Pad and one access road to the Test Pad <br />• Construction of the BB Pad and the access road to the HB Pad <br />• Construction of the MWP 2 Pad and improvement of the access road to the MWP 2 Pad <br />• Construction of the TM Pad <br />All wells approved under previous NOIs have been or will be drilled. <br />Modified surface excavations or other land disturbance proposed in support of AMSO's testing <br />program are shown on Figure A.2 as well as Figure 4-6 in Volume 1 of the Plan of Development <br />(POD). These figures present the final surface disturbances planned by AMSO for the Pilot Test <br />in Phase II. Surface processing facilities will be located on the Test Pad. <br />After adjustments to the final grading plan and incorporating the changes to the Test Pad, the <br />final surface disturbances by facility are as follow: <br />Facility <br />Test Pad - <br />Test Pad Acce: <br />TM Pad <br />MWP 2 Pad <br />MWP 2 Road <br />BB Pad <br />Disturbance <br />5.2 acres <br />,s Roads 0.6 acres <br />1.7 acre <br />1.2 acres <br />0.5 acres <br />1.2 acres <br />HB Road 0.3 acre <br />Total 10.7 acres
The URL can be used to link to this page
Your browser does not support the video tag.