My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-22_GENERAL DOCUMENTS - C1981044
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981044
>
2009-05-22_GENERAL DOCUMENTS - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:51 PM
Creation date
5/26/2009 12:10:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
5/22/2009
Doc Name
Proposed Decision & Findings of Compliance for RN5
Permit Index Doc Type
Findings
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12) The No. 9 Mine will not refill to the surface, but will refill to an equilibrium <br />level between the Twentymile Sandstone and the overlying White Sandstone. <br />13) The No. 9 Mine portal backfill area is too small to generate enough leachate to <br />have a measurable effect on nearby aquifers. <br />Observed Hydrologic Impacts <br />The monitoring plan contained in the permit application has been designed to verify <br />the permittee's projected hydrologic impacts of mining. Section 2.05 of the permit <br />application includes a description of the observed hydrologic impacts caused by <br />mining at the Eagle Mine Complex. Each year BTU EC assesses the on-going <br />impacts to the hydrologic system in its annual hydrologic report. Observed impacts <br />are summarized below. <br />Observed Ground Water Impacts <br />Mine Inflows and Discharges <br />Water is pumped from the underground mine workings to the ground surface at the <br />No. 5 Mine well and the 7 North Angle well. Annual hydrology reports show the <br />total discharge for the 5 and 6 Mines was a fairly constant 600 gpm during active <br />mining in the early 1990s. After mining ceased in 1995, sumped water was pumped <br />down. In 1997 and 1998, pumping became intermittent, averaging less than 1 gpm. <br />In 2008, pumping was approaching an average annual rate of 1,100 gpm. The <br />pumped mine water is discharged to the Williams Fork River at NPDES outfalls <br />003 (5 Mine well) and 024 (7 North Angle well). A total of more than 630 million <br />gallons of water were discharged in the most recent reporting year, 2008. <br />Monitoring data through 2008 collected at the outfalls indicate the mine water is <br />consistently alkaline, with total dissolved solids less than 1800 mg/l, and low <br />concentrations of iron and manganese. <br />Trout Creek Sandstone <br />Annual hydrology reports as recent as 2008 indicate no continuing mining-caused <br />change in the Trout Creek Sandstone potentiometric surface or water quality. The <br />water level in the Trout Creek Sandstone monitoring well (No. 5 Mine well) <br />dropped 200 ft. during 1989 and 1990. The drop probably was caused by pumping <br />of the three mine water supply wells completed in the Trout Creek, rather than by <br />mining in the overlying E and F coal seams. The water level fully recovered in <br />1991 and then fluctuated 200 ft. in 1998. The fluctuation is probably not related to <br />dewatering in the overlying E and F seams because the base of the E coal seam is <br />above the current water level in the No. 5 Mine well. The water level in the No. 5 <br />well stabilized in 1999 through 2000. Monitoring of the well was suspended in <br />2001 through 2003 as part of the temporary cessation monitoring plan. Since <br />monitoring was resumed the water level has remained relatively stable. Historical <br />field conductivity data for the Trout Creek Sandstone wells indicate no adverse <br />water quality impacts related to mining. <br />Eagle Mine Complex 24 Permit Renewal 05 <br />C-1981-044 May 22, 2009
The URL can be used to link to this page
Your browser does not support the video tag.