My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-21_HYDROLOGY - C1980006
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1980006
>
2009-05-21_HYDROLOGY - C1980006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:47 PM
Creation date
5/22/2009 12:02:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
HYDROLOGY
Doc Date
5/21/2009
Doc Name
Termination of Water Discharge
From
Energy Fuels Coal Inc
To
DRMS
Permit Index Doc Type
NPDES
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Official Use Onl <br />Water Quality Control Division <br />Permit -termination Form <br />? Date Sent April 24. <br />2007 <br /> Date Received <br /> Date to D.E. <br /> Date Recd from D.E. <br /> OK to Terminate <br />Facility Name: Kerr Coal Company <br />Starr Mine Permit No.: COG-850037 <br />Le al Contact: George V. Patterson. Mine Manager Le al Contact Phone No: (719) 784 6 3 9 5 <br />Facility Contact: Facility Contact Phone No.: (000) 000-0000 <br />Facility Address: P_O. Box 459 Legal Location: Sec 2, T8N, R78W and Sections 25, 26 <br />and 35, T9N R78W <br />Florence. CO 812 2 6 County: Jackson <br />Please answer the following questions and sign the certification. If you have any questions regarding your facility and the <br />information required, please contact your District Engineer, Andy Poirot at (970) 879-7479 . <br />Purpose of Request No longer needed Discharge was to Canadian River - <br />1. Is the construction complete? es ONO <br />a. If not, is there any plan to complete construction in the future? ?Yes IJNo <br />b. If so, is there an estimate of when? Dyes ONO <br />Date for start-up <br />2. If the facility is operational, is any process or other wastewater being produced? Dyes 12 No <br />Howmuch? gpd Facilities are reclaimed & released, <br />a. If yes, is the water being treated? El Yes ? No <br />b. What form of treatment is utilized? Discuss sizes <br />of unit processes and any chemical additions. <br />c. Is any of the process or any other wastewater or water <br />being discharged to waters of the state? (This <br />includes groundwater in cases like unlined lagoons.) <br />I . If yes. identify discharge point(s). <br />d. Is the facility designed to be a non-discharging (evaporative) system. <br />? Yes ? No <br />? Yes © No
The URL can be used to link to this page
Your browser does not support the video tag.