My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 5/22/2009, 8:32:50 AM-MR1
DRMS
>
Public
>
REVISION - 5/22/2009, 8:32:50 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:56 AM
Creation date
5/22/2009 8:42:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
5/21/2009
Doc Name
New MD application (MD-02) Non-confidential plan of development
From
American Shale Oil, LLC
To
DRMS
Type & Sequence
MD2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Detailed Drilling and Completion Plan <br />TP Pad <br />T-1 (Heater-Producer Test Well 1) (Figure 4-11) <br />• Drill up to a 24" diameter hole a minimum of 40 feet with at least 5 feet into competent <br />bedrock. Historically, surface casing holes have been 40 feet deep. <br />• Run 40', 94#, J-55 Surface Casing. <br />• Cement with "Neat Cement" to surface. <br />• Rig up diverter and wait on cement a minimum of 4 hours. <br />• Drill out from surface casing with nominal 12 1/4 " diameter bit. Drill to a depth to where <br />the down hole survey tools will not be influenced by the steel surface casing. <br />• Trip out of the hole and put on a mud motor with nominal 12 1/4 " bit. Utilize the motor <br />and surveys to stay vertical to a depth of 1158 feet. Complete directional surveys every <br />40 feet. <br />• • Directionally drill the nominal 12 1/4 " hole to 60 ° inclination (from vertical) at 2205 feet <br />MD, 2024 TVD (-top of the R1) then hold 60° to TMD of 2530 feet. <br />• Open the 12 1/4 " hole to 18" with hole opener. Circulate to clean and condition hole. <br />• Run 11 3/4 " casing to TMD of 2530. Casing will be 75# J-55 to the retort top (-top of <br />the RI) and alloy steel throughout the retort zone. <br />• Cement to surface from the retort top as per cement plan. <br />• Wait on cement for 12 hours. <br />• Condition the hole and run and hang the heater and production assembly. <br />• Refer to Appendix 4-3 for the completion details. <br />u <br />29
The URL can be used to link to this page
Your browser does not support the video tag.