Laserfiche WebLink
. (4a)g) Typical schematics of all drilled well types including those used for heating, freezing, <br />disposal or production activities detailing all casing and completion design including <br />materials used in all cementing operations <br />Drilling Program Overview: <br />The AMSO Oil Shale RD&D project is located in T. 2 S., R. 98 W., Sec. 21, E1/2SW1/4, <br />W1/2SE1/4, 6t' PM, Rio Blanco County, Colorado. <br />The Pilot Test described in this Plan of Development requires constructing three additional wells <br />on existing drill pads in addition to those previously permitted and, in some cases, already <br />constructed. <br />The first additional well is the Heater-Producer Well T-1, which will be drilled from the Test Pad <br />and completed under the TM Pad. The other two additional wells are tomography wells (TM-5 <br />and TM-6) to be drilled from the TM Pad. The location of these new wells is shown in Figure 4- <br />6. <br />The diagrams and drilling procedures for T-1 and the TM wells are based on the latest design <br />parameters, but are subject to change as new information, modeling, and testing evolve. <br />Previously permitted and constructed wells include two exploration wells (CH-1 and BH-1), <br />• three hydrological monitoring wells on the MWP 2 Pad, and one hydrological monitoring well <br />on the HB Pad. Four tomography wells (TM-1 to TM-4) also have been permitted. One <br />tomography well will be drilled in the Spring of 2009, and five will be drilled within the next <br />year. <br />• <br />28