Laserfiche WebLink
• hale course and surface coursc to provide all-%weather access to the pads and to reduce lilgitive <br />dust. <br />A Gencral Permit tilr Stornlwater Discharges Associated with ('onst•uction !Activity has been <br />obtained from CDPI W-Water Quality Control Division (See Appendix 4-7). and a band <br />Development Permit has been obtained from the CDPI IF-Air Pollution Control Division (See <br />Appendix 4-8) fur the proposed construction activities. ,A%ISO's activities have been approved <br />by Rio Manco Colllll\ through the issuance of -a temporary tIse Permit (See Appendix 4-9). <br />AtiISO is in the process ofconverting the Temporary I'se Permit to a Special I Ise Permit that <br />will he in lorce during the entire subsequent RDxD period. In addition. the Colorado DRMS <br />has approved a NOI (See Appendix 4-6) tur the activities. <br />(4a)d) The size, location and schematics of all structures and facilities to be built <br />AMSO will use portable or easily moved or removed structures and facilities conlined to the <br />"test Pad. A la\out 0t the structures to he designed and built fur the Pilot test is shown in Figure <br />4-6. I•hc structures will include process equipment freeze-protection enclosures; control room <br />and laboratory sUuctures; office. operating. and maintenance trailers; storage tanks (up to 20 tt <br />high): pipe runs and racks motor control center and cmcrjcnc\ power station; and an incinerator <br />(including a 45-65 ft stack). A cross-section showing the control room, processing building. and <br />incinerator is shown in Figure 4-10. <br />• Most ofthc surface processing equipment will he assembled off-site and brought to the 1 cst Pad <br />MI skids. Concrete foundations will utlllzed to the nlllllllium extent possible without <br />icopardir.ing the safety. pertormance. and/or operational status 0f the facilit\. Facilities haying <br />concrete tuundations will includc the control room (- 1000 sq. ft), fluid separation plant (--2000 <br />sq it.). incinerator. and major electrical service coniporlents. Details of all tllcSe facilities will be <br />determined during the detailed engineering phase. Portable trailers on NDAT 1 Pad will he used <br />for temporary living quarters. <br />Whitc River Flectric REA \?III permit and construct the electrical scr\ icc. Electrical service was <br />provided to M\VP 1 Pad during 2008, and - 1 Wk service will he connected to the Test Pad <br />during 2009. ANISO, or a natural gas provider. nlay permit and construct a natural gas service or <br />provide a propane service at the site. <br />a9WX U$ ACC , AVOUNAM <br />i <br />F <br />a¢AW I <br />6wr, mv <br />mf0 W,a <br />DOW AOWWAnN <br />aaauw AWRr air <br />DATUa ELE4'i <br />669000 <br />TYPr"G TiGIN TFIROUGNPLANT LOIA1014 AQRTHER4 Y <br />AXE r•=871MV <br />Figure 4-10. ( 'rocs-section 0/ the 1Ywin fwothic'tion /)cO showing the control hltijdinis , ille <br />• /W0CC.v% huil(lill,'. 1110 /hr incinerator. <br />26