My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 5/22/2009, 7:55:28 AM-MR1
DRMS
>
Public
>
REVISION - 5/22/2009, 7:55:28 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:56 AM
Creation date
5/22/2009 8:23:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
5/21/2009
Doc Name
New MD application (MD-02) Non-confidential Part 1
From
American Shale Oil, LLC
To
DRMS
Type & Sequence
MD2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE INFORMATION ON THIS PAGE DOES NOT NEED TO BE HELD CONFIDENTIAL <br /> <br />G. Total project area to be disturbed I -ll,,.-w. (acres) 0 <br />Fl. Describe the equipment to be used for the prospecting operationst <br />Commercial construction equipment_(dozer backhoe, grader dump trucks) wilt be.used , to construct pads.and roads. <br />Standard truck-mounted drilling equipment (rotary and core drilling rigs) will be used to drill test holes and wells. <br />Standard truck-mounted pump rig, or equivalent, will be used to set well pumps and hydraulic testing equipment. <br />Standard trucks/vans equipped to conduct downhole logging will be used to perform downhole logging and testing. <br />Commercial water truck will be used to haul water to and from the site. Commercial sewage disposal trucks will be used to <br />-- -_ -- - - <br />service portable toilets. <br />Describe and locate am, structures to be constructed ( i.e. stockpiles, pun k, impoundments): <br />Topsoil removed in support of pad and road construction will be stockpiled at each pad and properly protected for replacement during site <br />reclamation. Other material generated during pad and road construction will be stockpiled at each pad separate from soil stockpiles. <br />Please see attached Exhibit C - "Supplemental Information", Section III "Project Description°, Item No. 5. for additional details. <br />J. Describe anticipated relationship to surface water and groundwater ('proximity to streams, penetration ot'ground <br />water aquifers): <br />Please see attached Exhibit C - "Supplemental Information Section III "Project Description", Item No. 6,J_ <br />IV. OPERATION AND RECLAMATION MEASURES: <br />The Board suggests that a photographic record of the pre-p€ospt.ctin and post-prospecting conditions be kept by 1}ic <br />prOspe•ctor. These photos should be taken front the same location and. by the same method to clearly show die pre-prospecting <br />condition of the land and the reclamation eftoris. Upon completion of rec[aination and request for bond or surety rele isc. the <br />Board may consider the photos as evidence ol'adet uaic reclamation, tnd thus, be able; to act more quickly on the request for <br />release. <br />'L Prf7vide =i de c-rip iori of the. native elation of the area to be disturbed, inciudingy trkae, shrub. and grass rontr3turiaie?- ofib <br />Colo #f33€ £dT?t'sS, ai??_L:.;t74 tZ ad-quavt,14 ..I)i-st,ra;i'-? ccs7tlo criti ii,i?c ...edt !-set(.t,$tgr t.rtia, <br />2Y ?I '1 f. s,iav k .t _ .'B`. ¢7 ?r a . t:Ftc fF z1 'he, iw ar Iv _at ih . `. c.. f. <br />Please see attached Exhibit C - "Supplemental Information", Section IV "Operation and Reclamation Measures", Item No. 2. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.