Laserfiche WebLink
THE INFORMATION ON THIS PAGE DOES NOT NEED TO BE MELD CONFIDENTIAL <br /> <br />I)escribe proposed surface excaN?ation or other land disturbance; includin=r. roads, kits, trenches, tx?aste tiles. drill pads and <br />Collar srerts Of Undertround workinLgs, pond , clc... <br />Surface excavations or other land disturbances will include construction of (3) drill pads and associated soil stockpiles and <br />containmen k_ {2) new access roads and, associated soil stockpiles, (1)_upgrade of exist ng__ tv?o _4rack road, and {1) new short by-pass <br />road. Please see attached Exhibit C - "Supplemental Information Section III "Protect Description"Item No 5 for additional details. <br />6. Proposed Disturbance (approximatL} Describe the proposed drilling to he conducted. including; antici pared number of holes, <br />diameter.. depth, location. etc... Submit additional pa?cs if accessary: <br />A_ Drill Pads: Quentin 3 Averaac Width 207 {ft) Average Length _330 _ _(ft) <br />B. Drill Holes: Quamity 10 Depth 1060 to 2400 -(fly DiclttTefer 4 518 to 12 114 (in,) <br />C. Mud Pits. Quantity __3 ...... Avera,-Fe Width 30 ("ft.) Average l.,enoth 250 (#f) <br />Average Depth __?? (?) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts. rock dumps, or other ropes of disturbance, describe type, quantit3 and general dimensions: <br />Please see attached Exhibit C - "Supplemental Information", Section Ill "Project Description", Item No. 6. <br />-- ----------- ----------- <br />• <br />D. other Disturbances (pler-tse describe), <br />Earthen berms and drainage channels will he constructed for drill pads and access roads as required to control drainage and <br />provide spill containment. <br />F. Indicate C".h4n>°ntcals and Frick used or stored on site. List type. quantity and method to store. <br />Diesel fuel will be stored and used onsite for drilling equipment and portable generators. Diesel fuel will be stored in an approximate <br />_.._._..r.?. _.,._..._.._.,._._... ---- <br />8-foot by 25-foot fuel storage tank Diesel tanks will be surrounded by earthen berm capable of containing 110 percent of largest tank <br />. _,._..._.__ ..... <br />volume. Typical water-based drilling fluids consisting of fresh water, bentonde lignite caustic lime soda ash, and polymers will be store16 <br />...... <br />in approximate 8-foot by 20-foot tank. Drilling foam and deformer will be biodegradable Limited quantities of lubricants, oils, and gasoline <br />..... ............. ........... . ...... ...... ....... <br />may be stored onsite or trucked to the site as needed <br />1070 f j", 94 r ft (Disturbed width 24 fit <br />israiit{3.ntl' i .h+'.??ieti f2p?t(s1 l?i>>Cls 1155 ItiEIilj 14 ('11 i (Disturbed width 24 ft) <br />Are culverts or other crossrn w:, proposed`, If so, please describe:: Culverts will be installed per BLM requirements. Please <br />see Exhibit C - "Supplemental Information", Section Ill "Project Description", Item No. 5. <br />---------------------- <br />•